Tender Details

Particulars Details
Title
Construction Of Farm Pond In Pmksy 2.0 Block Kathumar (Package No. 07)
Description
Construction Of Farm Pond In Pmksy 2.0 Block Kathumar (Package No. 07)
Organisation Deptt. of Watershed Dev. and Soil Conservation | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 2500
EMD 1.89 Lakh
Tender Value
Place Kathumar
Link

AAAAAAAAAA

Login to view
Start Date May 08, 2025 15:30
End Date

17/05/2025 ( 2 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Construction of 4-lane gf western bypass from design km 0.000 (km 181.000 on nh-146) near lahdara village junction on nh-146 km 20.200 (km 223.200 on nh-44) near berkheri guru village junction on nh-44 of length-20.200 km in mp on ham.

Construction of 4-lane gf western bypass from design km 0.000 (km 181.000 on nh-146) near lahdara village junction on nh-146 km 20.200 (km 223.200 on nh-44) near berkheri guru village junction on nh-44 of length-20.200 km in mp on ham.

Read more
Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham

Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham

Read more
Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode

Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode

Read more
Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.

Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.

Read more
Independent engineer services for 4 laning of marakkanam-puducherry section of nh-332a in tamil nadu on ham (project length-46 km) (mahabalipuram-puducherry package-iii)

Independent engineer services for 4 laning of marakkanam-puducherry section of nh-332a in tamil nadu on ham (project length-46 km) (mahabalipuram-puducherry package-iii)

Read more
4 laning of marakkanam-puducherry section of nh-332a from km 62.000-km 108.047 in tamil nadu on ham (project length-46.047 km) (mahabalipuram-puducherry package-iii)

4 laning of marakkanam-puducherry section of nh-332a from km 62.000-km 108.047 in tamil nadu on ham (project length-46.047 km) (mahabalipuram-puducherry package-iii)

Read more
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode

Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode

Read more
Construction of 2l - ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan

Construction of 2l- ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan

Read more
Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).

Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise