Tender Details

Particulars Details
Title
(1) Development Of Approach Road From 2nd College Gate To In Front Of New Building At Regional Dental College, Ghy 32 (2) Construction Of Retaining Wall Along The Drain From The Exit Gate To Back Side Of Grade Iv Quarters At Regional Dental College
Description
(1) Development Of Approach Road From 2nd College Gate To In Front Of New Building At Regional Dental College, Ghy 32 (2) Construction Of Retaining Wall Along The Drain From The Exit Gate To Back Side Of Grade Iv Quarters At Regional Dental College
Organisation Government of Assam
Tender Id 2023_PWBNH_33198_1
Reference
Number
SE/BII_Rgionlal Dental Collage_Ghy32
Tender Fee 2000
EMD 1.35 Lakh
Tender Value
Place O/o the SE, PWD Guwahati Building Circle-II Ghy-3
Link https://assamtenders.gov.in
Start Date October 20, 2023 17:30
End Date

09/11/2023 ( Expired 590 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)

Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)

Read more
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Provision of retaining wall from main gate to basket ball ground at terriers enclave 172 inf bn ta madras brichugnj military station sri vijaya puram

Provision of retaining wall from main gate to basket ball ground at terriers enclave 172 inf bn ta madras brichugnj military station sri vijaya puram

Read more
Construction of 1400 m long approx. new rcc framed brick boundary wall of 230mm thick, 3.05m height and 600mm y overhang with concertina coil by dismantling existing old boundary wall with installing of 2 nos gate near kali bari from hukuta chariali to sbi colony at duliajan, including supply of all materials except cement

Construction of 1400 m long approx. new rcc framed brick boundary wall of 230mm thick, 3.05m height and 600mm y overhang with concertina coil by dismantling existing old boundary wall with installing of 2 nos gate near kali bari from hukuta chariali to sbi colony at duliajan, including supply of all materials except cement

Read more
Construction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc

Construction of rcc ohr along with land development approach road guard room and boundary wall&amp#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&amp#x0d phase-iii within amc

Read more
Provision of fencing in front and back side and repair refixing of main entry gate with steel pillars in type-iv flat allotted to dr. awadhesh kumar at satyawati college

Provision of fencing in front and back side and repair refixing of main entry gate with steel pillars in type-iv flat allotted to dr. awadhesh kumar at satyawati college

Read more
Construction of retaining wall from new bridge (jama masjid) to jam river, ward no. 06 in nagar panchyat limit at kondhali

Construction of retaining&amp#x0d wall from new bridge&amp#x0d (jama masjid) to jam river,&amp#x0d ward no. 06 in nagar&amp#x0d panchyat limit at kondhali

Read more
Providing retaining wall to the eastern side approach ramp southern side wall _ reach-ii of primary pond at ash dyke

Providing retaining wall to the eastern side approach ramp southern side wall _ reach-ii of primary pond at ash dyke

Read more
Providing retaining wall to the eastern side approach ramp northern side wall _ reach ii of primary pond at ash dyke

Providing retaining wall to the eastern side approach ramp northern side wall _ reach ii of primary pond at ash dyke

Read more
Providing retaining wall to the eastern side approach ramp southern side wall _ reach i of primary pond at ash dyke

Providing retaining wall to the eastern side approach ramp southern side wall _ reach i of primary pond at ash dyke

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise