Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
E Quotation For Preparation Of Estimate Not Available In Ssr On Second And Third Floor Of Court Building At Bhusawal Tal.Bhusawal
|
| Description |
E Quotation For Preparation Of Estimate Not Available In Ssr On Second And Third Floor Of Court Building At Bhusawal Tal.Bhusawal
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_PWR_959942_1 |
|
Reference Number |
E-Quotation Notice No-03 For 2023-24 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | 0 |
| Place | Executive Engineer P.W.(North) Division, Jalgaon |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | November 03, 2023 18:30 |
| End Date |
Expired
09/11/2023
Expired 967 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual operation and maintenance of central air condition work at kda main office building ground first, second, thrd floor and auditorium.
Annual operation and maintenance of central air condition work at kda main office building ground, first, second, thrd floor and auditorium.
Read moreAnnual percentage rate contract on mes ssr 2020 for civil maintenance/ repair works of traverse, toe wall, drain and gantry including other connected works in filling area inside at ofk.
Annual percentage rate contract on mes ssr 2020 for civil maintenance/ repair works of traverse, toe wall, drain and gantry including other connected works in filling area inside at ofk.
Read moreGeneral maintenance contract in percentage rate contract on mes ssr 2020 for toilet maintenance works, including masonry, joinery, concrete work, painting, plumbing sanitary, fabrication, roof/roof members and connected works inside factory at ofk.
General maintenance contract in percentage rate contract on mes ssr 2020 for toilet maintenance works, including masonry, joinery, concrete work, painting, plumbing sanitary, fabrication, roof/roof members and connected works inside factory at ofk.
Read moreEngagement of user fee agency through e-quotation for shahbpur fee plaza at km 5.925 for the section from km.0.000 to km. 43.000(barabanki-jarwal section) of nh-28c in the state of uttar-pradesh
Engagement of user fee agency through e-quotation for shahbpur fee plaza at km 5.925 for the section from km.0.000 to km. 43.000(barabanki-jarwal section) of nh-28c in the state of uttar-pradesh
Read moreRmoei fans i/c sub-station, dg set, lifts, wet riser system in office cum lab building for gsi karunamoyee at sector-ii, salt lake, kolkata-91 during 2026-27. (sh: providing services for operation and maintenance of iei, pump dg and sub-station equipments, afas, wet riser etc.).
Read moreEngagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Read moreConstructions of ramps for handicapped employees in permanent and temporary office building at nangal township.
Constructions of ramps for handicapped employees in permanent and temporary office building at nangal township.
Read morePlanning, designing and construction of l-shaped building in technology block (g plus 4) at rie, mysore including pump room, internal water supply, sanitary installations, civil external service connections, internal electrical installations, electrical external service connections, firefighting and fire alarm system, lightning conductors, lifts, overhead water tank, septic tank, ups, ip based cctv system, lan and networking system, and illuminated signages, vrv/vrf system, ro water purifier, lab equipments (wall table, sitting table, storage cabinet, modular fume hood etc) development works i/c levelling footpath, external sewerage, storm water drains street lighting with led consultancy services for planning and designing of project inclusive of architectural drawings, structural mep service local body approvals including testing and commissioning of all services, making building fit for occupation and functional all complete on engineering, procurement and construction (epc) mode-i.
Read moreE-quotation for preparation of estimate providing office furniture at jawahar navodaya vidyalaya at bhusawal, tal.bhusawal. (second call)
E-quotation for preparation of estimate providing office furniture at jawahar navodaya vidyalaya at bhusawal, tal.bhusawal. (second call)
Read moreE-quotation for preparation of estimate providing office furniture at jawahar navodaya vidyalaya at bhusawal, tal.bhusawal.
E-quotation for preparation of estimate providing office furniture at jawahar navodaya vidyalaya at bhusawal, tal.bhusawal.
Read moreof your Industry type