Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Tennis Court First Layer,Tennis Court Second Layer,Tennis Court Third Layer,Tennis Court Fourth Lay
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2025/B/6422269 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 05, 2025 01:16 |
| End Date |
Expired
25/08/2025
Expired 415 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Read moreTender for providing vitrified tile flooring in the first second and third floor corridor at nsic stbp chennai
Tender for providing vitrified tile flooring in the first second and third floor corridor at nsic stbp chennai
Read moreResurfacing of lawn tennis court with led score board
Resurfacing of lawn tennis court with led score board
Read moreAcrylic synthetic lawn tennis court with lights and fencing
Acrylic synthetic lawn tennis court with lights and fencing
Read morePms _first year,first visit,pms _first year,second visit,pms _second year,first visit,pms _second year,second visit,pms _third year,first visit,pms _third year,second visit,bd visit_first year,first visit,bd visit_first year,second visit,bd visit_second year,first visit,bd visit_second year,second visit,bd visit_third year,first visit,bd visit_third year,second visit
Pms _first year,first visit,pms _first year,second visit,pms _second year,first visit,pms _second year,second visit,pms _third year,first visit,pms _third year,second visit,bd visit_first year,first visit,bd visit_first year,second visit,bd visit_second year,first visit,bd visit_second year,second visit,bd visit_third year,first visit,bd visit_third year,second visit
Read moreSupply, installation, testing and commissioning of air conditioning system and fire fighting works for proposed pdic building second, third and fourth floor (a-block and d-block), be-bg.
Supply, installation, testing and commissioning of air conditioning system and fire fighting works for proposed pdic building second, third and fourth floor (a-block and d-block), be-bg.
Read moreKone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Kone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Read moreProviding renovation works in existing lawn tennis court at katpp colony, jhalawar.
Providing renovation works in existing lawn tennis court at katpp colony, jhalawar.
Read moreSelection of third party auditor (tpa) for virtual court project
Selection of third party auditor (tpa) for virtual court project
Read moreConstruction of 14 court building anuppur distt. anuppur- m.p. (first call)
Construction of 14 court building anuppur distt. anuppur- m.p. (first call)
Read moreof your Industry type