Tender Details
Particulars | Details |
---|---|
Title |
Renovation Of Washrooms Attached With Chamber Of Court Room No 39 Cleaning Of Over Head Pvc Water Tanks And Under Ground Drinking Water Reservoir And Other Allied Work At Punjab And Haryana High Court Sector 1 Chandigarh
|
Description |
Renovation Of Washrooms Attached With Chamber Of Court Room No 39 Cleaning Of Over Head Pvc Water Tanks And Under Ground Drinking Water Reservoir And Other Allied Work At Punjab And Haryana High Court Sector 1 Chandigarh
|
Organisation | Chandigarh Administration | State Govt. and UT |
Tender Id | 2024_CHD_80995_1 |
Reference Number |
PH8/2024/1623147/75 |
Tender Fee | 0 |
EMD | 5055 |
Tender Value | |
Place | Chandigarh |
Link | https://etenders.chd.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=99772 |
Start Date | July 02, 2024 22:30 |
End Date |
09/07/2024 ( Expired 309 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cleaning of existing road gullies, manholes and allied system for proper storm water drainage from various non residential buildings i.e. bus stand sector 17, old district court, sector 17, rla-17, state library-17, underpass-17,b.ed college-20, dc o
Cleaning of existing road gullies, manholes and allied system for proper storm water drainage from various non residential buildings i.e. bus stand sector 17, old district court, sector 17, rla-17, state library-17, underpass-17,b.ed college-20, dc o
Read moreRenovation of phs toilets at (deptt. of water resources punjab) sco no. 43 1st, 2nd and 3rd floor and sco no 38,39,40,41,44,45,46 (2nd and 3rd floor) sector 17e ut chandigarh
Renovation of phs toilets at (deptt. of water resources punjab) sco no. 43 1st, 2nd and 3rd floor and sco no 38,39,40,41,44,45,46 (2nd and 3rd floor) sector 17e ut chandigarh
Read moreConstruction of over head water reservoir along with installation of iron removal plant sinking and installation of tube well with solar oparated submerssible pump and allied works near bachha miah masjid under k.d.gram gp
Construction of over head water reservoir along with installation of iron removal plant sinking and installation of tube well with solar oparated submerssible pump and allied works near bachha miah masjid under k.d.gram gp within dinhata-ii ps
Read moreMtc. of e.i. in nrb at chandigarh. (annual maintenance contract of cctv cameras in punjab and haryana high court, sector 1, chandigarh).
Mtc. of e.i. in nrb at chandigarh. (annual maintenance contract of cctv cameras in punjab and haryana high court, sector 1, chandigarh).
Read moreAnnual mtc. of 2 nos. 8 passenger lifts aircon elevator at gate no. 1 in punjab and haryana high court building, sector 1, at chandigarh
Annual mtc. of 2 nos. 8 passenger lifts aircon elevator at gate no. 1 in punjab and haryana high court building, sector 1, at chandigarh
Read moreRepair and service of air conditioners pillar type cassette type ac and ductable units in punjab and haryana high court sector-1, u.t., chandigarh.
Repair and service of air conditioners pillar type cassette type ac and ductable units in punjab and haryana high court sector-1, u.t., chandigarh.
Read moreMaintenance of public health services (i.e. cleaning of ugr tanks, pvc tanks and other allied works of phs) and refilling of fire extinguishers in ncc complex building, sector-31, chandigarh
Maintenance of public health services (i.e. cleaning of ugr tanks, pvc tanks and other allied works of phs) and refilling of fire extinguishers in ncc complex building, sector-31, chandigarh
Read moreCleaning of over terrace water tanks in hostel area and guest house once in every month and rest of other tanks four times in a year including two nos underground reservoirs four times in a year and two nos oht one time in a year for 1 one year entire srfti complex kolkata for year 2025 2026
Cleaning of over terrace water tanks in hostel area and guest house once in every month and rest of other tanks four times in a year including two nos underground reservoirs four times in a year and two nos oht one time in a year for 1 one year entire srfti complex kolkata for year 2025 2026
Read moreDisinfecting and cleaning of rcc over head water storage tanks, underground water reservoirs, r.c.c and pvc roof tanks at maithon colony, dvc, maithon
Disinfecting and cleaning of rcc over head water storage tanks, underground water reservoirs, r.c.c and pvc roof tanks at maithon colony, dvc, maithon
Read moreAnnual maintenance of fm 200 and novec 1230 gas suppression system for asd lab near museum, ncc room near library of punjab and haryana high court sector-1, chandigarh for the period of 05.04.2025 to 04.04.2026 i.e. 12 months.
Annual maintenance of fm 200 and novec 1230 gas suppression system for asd lab near museum, ncc room near library of punjab and haryana high court sector-1, chandigarh for the period of 05.04.2025 to 04.04.2026 i.e. 12 months.
Read moreof your Industry type