Tender Details
Particulars | Details |
---|---|
Title |
Balance Work For Construction Of Road From Patnazi To Kither, Package No. Jk04 146, Phase Viii, Stage I, Block Bunjwah, District Kishtwar. Length 15.50 Kms
|
Description |
Balance Work For Construction Of Road From Patnazi To Kither, Package No. Jk04 146, Phase Viii, Stage I, Block Bunjwah, District Kishtwar. Length 15.50 Kms
|
Organisation | National Rural Road Development Agency (NRRDA) |
Tender Id | 2023_JKRRD_129090_1 |
Reference Number |
e-NIT No CEJ/PMGSY/753 OF 2023-24 DTD 31-10-2023 |
Tender Fee | 8500 |
EMD | 10.69 Lakh |
Tender Value | |
Place | Office of The Chief Engineer PMGSY(JKRRDA) Jammu |
Link | https://pmgsytenders.gov.in |
Start Date | November 04, 2023 15:30 |
End Date |
13/11/2023 ( Expired 548 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham
Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham
Read moreName of work construction of drain and cement concrete road from lokendra house to sachin house on maruti city road in ward no. 23 kahrai.
Name of work construction of drain and cement concrete road from lokendra house to sachin house on maruti city road in ward no. 23 kahrai.
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreConstruction of remaining works of fatgali to dhamoli -malujhal-okhalso motor road from garud-bageshwar motor road in district bageshwar assembly constituency under manifesto of honorable chief minister no 804/2014 (second phase stage 1)
Construction of remaining works of fatgali to dhamoli -malujhal-okhalso motor road from garud-bageshwar motor road in district bageshwar assembly constituency under manifesto of honorable chief minister no 804/2014 (second phase stage 1)
Read moreNie-t-31/2025-26 (sl. no. 04)
(i)construction of cc road from old 17 mile anup das house to hapijuddin sk house at birnagar-i gram panchayat under kaliachak-iii block in the district of malda. (length- 980 m,width- 3.75 m) (ii) construction of cc road from rameser tola old nh
Read moreReconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Read moreNie-t-32/2025-26 (sl. no. 06)
Construction of cc road from sadlichak high school to khoka more in sadlichak g.p under harishchandrapur-ii block in the district of malda. (length- 1 800 m, width- 3.75 m).
Read moreof your Industry type