Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of High Temperature Reheat, Economisr And Hanger Platen Tubes For Unit 34 Boiler Towards Annual Overhaul/Emergen Cy Works
|
| Description |
Procurement Of High Temperature Reheat, Economisr And Hanger Platen Tubes For Unit 34 Boiler Towards Annual Overhaul/Emergency Works
|
| Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
| Tender Id | 744690 |
|
Reference Number |
94/P11/High Temperature Reheat, Economiser and Hanger Planten Tubes Stg2/24-25 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | AP |
| Link |
View Original Tender Notice
https://tender.apeprocurement.gov.in |
| Start Date | July 26, 2024 00:30 |
| End Date |
Expired
08/08/2024
Expired 796 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Read moreBmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read moreProcurement of high temperature re-heat, economiser hanger platen tubes for unit-34 boiler
Procurement of high temperature re-heat, economiser hanger platen tubes for unit-34 boiler
Read moreRenewal of defective boiler tubes or bends in economizer hanger tubes
Renewal of defective boiler tubes or bends in economizer hanger tubes
Read moreSupply of seamless boiler tubes for unit-10 overhaul works
Supply of seamless boiler tubes for unit-10 overhaul works
Read moreTube thickness survey of the boiler tubes for unit-2 boiler during overhaul in ntpl
Tube thickness survey of the boiler tubes for unit-2 boiler during overhaul in ntpl
Read moreMtps i bm unit iv boiler pressure parts replacement of most overheated hot reheat coil rear side tubes in boiler inter pass area
Mtps i bm unit iv boiler pressure parts replacement of most overheated hot reheat coil rear side tubes in boiler inter pass area
Read moreTtps mech ii bm unit iv certain specified works to be carried out in different locations of unit iv boiler in final sh ltsh ltsh terminal tubes sh hanger tubes steam cooled wall tubes eco hanger tubes economizer coils etc during overhaul for the year
Ttps mech ii bm unit iv certain specified works to be carried out in different locations of unit iv boiler in final sh ltsh ltsh terminal tubes sh hanger tubes steam cooled wall tubes eco hanger tubes economizer coils etc during overhaul for the year
Read moreTtps mech ii bm unit iv certain specified works to be carried out in different locations of unit iv boiler in final sh ltsh ltsh terminal tubes sh hanger tubes steam cooled wall tubes eco hanger tubes and economizer coils etc during overhaul for the
Ttps mech ii bm unit iv certain specified works to be carried out in different locations of unit iv boiler in final sh ltsh ltsh terminal tubes sh hanger tubes steam cooled wall tubes eco hanger tubes and economizer coils etc during overhaul for the
Read moreSupply of seamless boiler tubes for unit-9 overhaul works 2024-25
Supply of seamless boiler tubes for unit-9 overhaul works 2024-25
Read moreof your Industry type