Tender Details
Particulars | Details |
---|---|
Title |
Sopd G 23 24 65 (I) Construction Of Fetagaon Namghor To Fetabosti From Ch 0.00 M To 1950.00 M (L1.95 Km) (Ii)construction Of Road From 2nd Km Of Bohikhuaghat Ali To No. 1 Bamungaon Under Sopd (G) For The Year 2023 24 Under Bokakhat Dergaon
|
Description |
Sopd G 23 24 65 (I) Construction Of Fetagaon Namghor To Fetabosti From Ch 0.00 M To 1950.00 M (L1.95 Km) (Ii)construction Of Road From 2nd Km Of Bohikhuaghat Ali To No. 1 Bamungaon Under Sopd (G) For The Year 2023 24 Under Bokakhat Dergaon
|
Organisation | Public Works Roads Department | State Govt. and UT |
Tender Id | 2024_PWD_36724_1 |
Reference Number |
No. CE/DEV/TB/741/2023-24/15 |
Tender Fee | 4830 |
EMD | 4.83 Lakh |
Tender Value | |
Place | Golaghat |
Link | https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=60004 |
Start Date | March 03, 2024 19:30 |
End Date |
12/03/2024 ( Expired 408 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreWidening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Read moreWbpwd/pw(r)/se/shc/nit no 02 of 2025-2026(2nd-call)
Herobhanga vidyasagar vidyamandir to jharkhali ferry ghat road, from 0.00 kmp to 3.80 kmp, widening and strengthening work under south 24-parganas highway division, p.w (roads) directorate in the district of south 24-parganas.
Read moreAAAAAAAAAA
Login to viewConstruction of rcc storm water drain and a box culvert at asansol bypass to domohani road at 1.9 km, under asansol highway division in the district of paschim burdwan.
Read moreConstruction work of 30 mtr span r.c.c. p.s.c girder bridge at km 1 of motor road up to kalagaon on danda lakhound road of i.t. park in raipur constituency of dehradun district under state sector.
Construction work of 30 mtr span r.c.c. p.s.c girder bridge at km 1 of motor road up to kalagaon on danda lakhound road of i.t. park in raipur constituency of dehradun district under state sector.
Read moreImprovement strengthening of road from burighat to sermunii in tripura length15.862 km under nesidsroads on engineering procurement construction epc mode
Improvement strengthening of road from burighat to sermunii in tripura length15.862 km under nesidsroads on engineering procurement construction epc mode
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreStrengthening of the road from mrl-08 kattuputhur- valayapatti road to nagainallur m kalathur road,thottiyam block,tiruchirappalli district pmgsy batch-i-2024-25 including maintenance of 5 year pkg no.tn22-221
Strengthening of the road from mrl-08 kattuputhur- valayapatti road to nagainallur m kalathur road,thottiyam block,tiruchirappalli district pmgsy batch-i-2024-25 including maintenance of 5 year pkg no. tn22-221
Read moreStmc work of left out portion of nh 120 of dumraon bazar portion from ch 240.200 to ch 245.400 for the year of 2023 24
Stmc work of left out portion of nh 120 of dumraon bazar portion from ch 240.200 to ch-245.400 for the year of 2023 24
Read moreIe services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Read moreof your Industry type