| Particulars | Details |
|---|---|
| Title |
Dark Fiber Leasing For Two No. Of Links In Mumbai Intracity
|
| Description |
Dark Fiber Leasing For Two No. Of Links In Mumbai Intracity
|
| Organisation | Power Grid Corporation of India Limited | Central Govt. Ministry/Department |
| Tender Id | 26151 |
|
Reference Number |
WR1/NT/S-MISC/DOM/ZA3/25/10424 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Maharashtra |
| Link |
View Original Tender Notice
https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=095abcce-cdc4-4a47-a495-c591709c8803 |
| Start Date | August 05, 2025 18:40 |
| End Date |
Expired
16/08/2025
Expired 424 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Leasing of dark fiber of opgw laid on upptcl eht lines for 5 years
Leasing of dark fibers of opgw laid on upptcl eht lines for five years, renewable twice for period of 5 years each with mutual consent.
Read moreConstruction of platform for the co-location space provided for the dark fiber lessee at 400 kv substation and 220 kv substation bina.
Construction of platform for the co-location space provided for the dark fiber lessee at 400 kv substation and 220 kv substation bina.
Read moreImprovement of pathway in between the dark complax and mittal tower rambhau sudam bhoir marg sector 44a under prabhag samiti no.26 b at belapur ward
Improvement of pathway in between the dark complax and mittal tower rambhau sudam bhoir marg sector 44a under prabhag samiti no.26 b at belapur ward
Read moreRepair of two utility watrepumps sets
Repair of two utiliy water pumps sets of blq1and blq3 platforms
Read moreProviding intensives services for 22 bedded micu units on outsource basis at hbt trauma care hospital jogeshwari east for a period of two years
Providing intensives services for&#x0d 22 bedded micu units on outsource basis at hbt trauma care&#x0d hospital jogeshwari east for a&#x0d period of two years
Read moreReinstatement of trenches taken by various external and internal utilities in greater mumbai for period of two years for zone-i
Reinstatement of trenches taken by various external and internal utilities in greater mumbai for period of two years for zone-i
Read more6 port 6 core fiber liu,12 core single mode fiber optic cable,fiber joint box splice closure,fiber optic patch box termination box,fusion fiber splicing,fiber optic cable laying,gigabit fiber media converter,5 port gigabit network switch,16 port gigabit network switch,dual band wifi router,wifi network access point,19 inch networking rack,network io set,65 inch smart tv,1 point 5 ton split inverter air conditioner,2d acrylic honour board,1 point 5 sq mm electrical wire white 180 meter pack,1 point 5 sq mm electrical wire red 180 meter pack,1 point 5 sq mm electrical wire yellow 180 meter pack,1 point 5 sq mm electrical wire black 180 meter pack,commercial manual two wheel wheelbarrow trolley,computer system,24 v pure sine wave inverter ups,12 v 250 ah tubular battery,cctv camera system complete installation,250 lph industrial ro plant
6 port 6 core fiber liu,12 core single mode fiber optic cable,fiber joint box splice closure,fiber optic patch box termination box,fusion fiber splicing,fiber optic cable laying,gigabit fiber media converter,5 port gigabit network switch,16 port gigabit network switch,dual band wifi router,wifi network access point,19 inch networking rack,network io set,65 inch smart tv,1 point 5 ton split inverter air conditioner,2d acrylic honour board,1 point 5 sq mm electrical wire white 180 meter pack,1 point 5 sq mm electrical wire red 180 meter pack,1 point 5 sq mm electrical wire yellow 180 meter pack,1 point 5 sq mm electrical wire black 180 meter pack,commercial manual two wheel wheelbarrow trolley,computer system,24 v pure sine wave inverter ups,12 v 250 ah tubular battery,cctv camera system complete installation,250 lph industrial ro plant
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreRehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreof your Industry type