Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Niet No 50/ Bqa Of 2023 2024 Of Ee/Bqa, Phe Dte.(Sl.No 05)
|
| Description |
Construction Of Pump House With Ancillary Works For Newly Constructed Tubewell Site (Location Kesia High School) Of Zone G (Kadra) In Connection With Augmentation Of Khatra Hirbandh Ranibandh Water Supply Scheme (Brgf Ph I)
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2023_PHED_631118_5 |
|
Reference Number |
- |
| Tender Fee | 0 |
| EMD | 14340 |
| Tender Value | - |
| Place | BANKURA |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1351593 |
| Start Date | December 26, 2023 23:00 |
| End Date |
Expired
15/01/2024
Expired 1004 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tn.09/sl.no.05/ccr division-ii/non plan work
Availing pump operator for vyasarpadi vehicular subway at km.4/4 of grand northern trunk road for the period from 01.11.2026 to 31.03.2027
Read moreTn.06/sl.no.05/ccr division-i/non plan work 2026-27
Engaging watchman and sweeper for shanthi theatre pedestrian subway at km 2/0 of grand southern trunk road for the period from 01.11.2026 to 31.03.2027
Read moreProviding installation testing and commissioning of scada for udhampur town under amrut 2 including comprehensive operation and maintenance for 05 years
Providing installation testing and commissioning of scada for udhampur town under amrut 2 including comprehensive operation and maintenance for 05 years
Read moreConstruction of tunnel at apati nallah for the length 50 x 3 - 150mtr
Construction of tunnel at apati nallah for the length 50 x - 150mtr
Read moreDeep drilling of 125 mm dia bore holes by using odex method including providing, installation, testing, commissioning of mark ii hand pumps and construction of platforms at (05 nos) different locations in district doda on turnkey basis (epc) under di
Deep drilling of 125 mm dia bore holes by using odex method including providing, installation, testing, commissioning of mark ii hand pumps and construction of platforms at (05 nos) different locations in district doda on turnkey basis (epc) under di
Read moreDrilling of tubewell at various place in ward no. 05
Drilling of tubewell at various place in ward no. 05
Read moreConstr of 05 caverns, each 63.5m in length, comprising 40m main cavern and 23.5m approach cavern with portal, including 4m x 7.5m niches/ living rooms on both sides of the approach cavern with the approach road connecting to existing rd at
General karzok under project himank in ladakh ut on epc mode
Read moreLv2 icvs 5120720411517 765-49-51 or 765-49-108 stop step,lv2 icvs 765-05-51 nipple,lv2 icvs 5315-008291 765-17-464 pin lock,lv2 icvs 3040720257133 765-50-2425 lever 765-50-2425,lv2 icvs 3040720258227 675-50-sb301 handle 675-50-sb301
Lv2 icvs 5120720411517 765-49-51 or 765-49-108 stop step,lv2 icvs 765-05-51 nipple,lv2 icvs 5315-008291 765-17-464 pin lock,lv2 icvs 3040720257133 765-50-2425 lever 765-50-2425,lv2 icvs 3040720258227 675-50-sb301 handle 675-50-sb301
Read moreProviding, laying and compaction of wmm 75 mm thk (in two layers), wmm 100 mm thk, ilcb 80 mm thk of m-50 grade , sand blanketing 30 mm thk and edge block with pcc m 30 grade bet km 0.00-11.40 on lungar-do mane-tulung la rd
Providing, laying and compaction of wmm 75 mm thk (in two layers), wmm 100 mm thk, ilcb 80 mm thk of m-50 grade , sand blanketing 30 mm thk and edge block with pcc m 30 grade bet km 0.00-11.40 on lungar-do mane-tulung la rd
Read moreSurf wk incl constr of subgrade, gsb, wbm, dbm , bc, p/coat, t/coat, hard shoulder and moorum filling on approach rd-2 from km 0 to km 5.531 and approach rd-3 from km 0 to km 4.835 of manipur river (west bank near bp-47) to bp-50 in manipur state
Surf wk incl constr of subgrade, gsb, wbm, dbm , bc, p/coat, t/coat, hard shoulder and moorum filling on approach rd-2 from km 0 to km 5.531 and approach rd-3 from km 0 to km 4.835 of manipur river (west bank near bp-47) to bp-50 in manipur state
Read moreof your Industry type