Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Tunnel At Apati Nallah For The Length 50 X 3 150mtr
|
| Description |
Construction Of Tunnel At Apati Nallah For The Length 50 X 150mtr
|
| Organisation | Public Works Department | Chief Engineer PHE/I and FC - Ladakh | Superintending Engineer, PHE/I FC, Circle Kargil | Executive Engineer, IFC Div Kargil |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 1500 |
| EMD | 3.01 Lakh |
| Tender Value | 1.5 Crore |
| Place | Ladakh |
| Link | Login to view |
| Start Date | October 13, 2026 22:30 |
| End Date |
Open
22/10/2026
8 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of new earthen pond at apati including snow check dam and surface trenching for ground water recharge at apati nallah
Construction of new earthen pond at apati including snow check dam and surface trenching for ground water recharge at apati nallah
Read morePmc services for dpr pre constr activities supervision for constr of highway tunnel of tentative length 5.00 km (zamindar gali tunnel) on h-z-m rd incl approaches on both sides (tentative length 11 km) under (p) beacon in ut of j k
Pmc services for dpr, pre-constr activities, supervision for constr of highway tunnel of tentative length 5.00 km (zamindar gali tunnel) on h-z-m rd incl approaches on both sides (tentative length 11 km) under (p) beacon in ut of j k
Read morePmc services for dpr, pre-constr activities, supervision for constr of highway tunnel of tentative length 2.20 km (km 12.90-23.00 on mpd rd incl constr of approach rd to nhdl (ps) spcn (1) length of 2.6 km from south portal of tunnel at km 12.90
Pmc services for dpr, pre-constr activities, supervision for constr of highway tunnel of tentative length 2.20 km (km 12.90-23.00 on mpd rd incl constr of approach rd to nhdl (ps) spcn (1) length of 2.6 km from south portal of tunnel at km 12.90
Read moreConstruction of r.c.c drain / nallah adjacent to shiv temple near dhaba morh on banganga track (length 125 mtr or 410 rft).
Construction of r.c.c drain / nallah adjacent to shiv temple near dhaba morh on banganga track (length 125 mtr or 410 rft).
Read moreConstruction of 50 mtr span single lane steel truss motorable bridge over hill nallah at approach road khadapa middle marhote
Construction of 50 mtr span single lane steel truss motorable bridge over hill nallah at approach road khadapa middle marhote
Read moreof your Industry type