Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Road From Dingla Kandyara Auqaf Colony To Mohalla Dhara By Way Of Cross Drainage,Walling, Providing And Laying Of Wbm Grade Iii, 50 Mm Thick Bm And 25 Mm Thick Ogpc
|
Description |
Construction Of Road From Dingla Kandyara Auqaf Colony To Mohalla Dhara By Way Of Cross Drainage,Walling, Providing And Laying Of Wbm Grade Iii, 50 Mm Thick Bm And 25 Mm Thick Ogpc
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWDJK_256257_1 |
Reference Number |
e-NIT No.39/2024-25 dated 10-08-2024 |
Tender Fee | 600 |
EMD | 39700 |
Tender Value | |
Place | Poonch |
Link | https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=747099 |
Start Date | August 10, 2024 23:30 |
End Date |
16/08/2024 ( Expired 268 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
P and l of dbm 7.50 cm, bc 4.00 cm with hmp mix, laying by p/finisher and including cleaning of rd surface, applying p/coat and t/coat, road marking 2.5 mm thick for surf wks bet km 98.5 and km 107.2 on rd birdhwal-pugal-bajju under 101 rcc/49 brtf
P and l of dbm 7.50 cm, bc 4.00 cm with hmp mix, laying by p/finisher and including cleaning of rd surface, applying p/coat and t/coat, road marking 2.5 mm thick for surf wks bet km 98.5 and km 107.2 on rd birdhwal-pugal-bajju under 101 rcc/49 brtf
Read moreSurfacing works of gsb 15 cm thick wbm 75 mm thick dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 14.350 on puwarti gomaguda road
Surfacing works of gsb 15 cm thick wbm 75 mm thick dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 14.350 on puwarti gomaguda road
Read moreProviding and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Providing and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Read moreProviding and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector between km 15.00 to km 42.00 at different stretches on road pithoragarh-tawaghat and tack coat with bitumen emulsion over existing surface, correction work w
Providing and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector between km 15.00 to km 42.00 at different stretches on road pithoragarh-tawaghat and tack coat with bitumen emulsion over existing surface, correction work w
Read moreZone no. 03, ward no.10, 11, 12, 13, 14, 15, 16, 22, 23, 24 and 25, providing and laying of hume pipe and construction of wbm road (piece work) in different places.
Zone no. 03, ward no.10, 11, 12, 13, 14, 15, 16, 22, 23, 24 and 25, providing and laying of hume pipe and construction of wbm road (piece work) in different places.
Read moreBalance work for construction of road from kaloon to haji shark harayala via dharana, mendhar by way of earth work in cutting, cross drainage, walling , providing and laying of 150mm thick wbm grade-ii,75mm thick wbm grade-iii and 25 mm thick ogpc
Balance work for construction of road from kaloon to haji shark harayala via dharana, mendhar by way of earth work in cutting, cross drainage, walling , providing and laying of 150mm thick wbm grade-ii,75mm thick wbm grade-iii and 25 mm thick ogpc
Read moreProviding and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector between km 0.00 to km 57.00 at different stretches on road jauljibi-munsiyari and tack coat with bitumen emulsion over existing surface, correction work with
Providing and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector between km 0.00 to km 57.00 at different stretches on road jauljibi-munsiyari and tack coat with bitumen emulsion over existing surface, correction work with
Read moreProviding and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector from km 114.000 to 123.000 (at different stretches) on baijnath-munsiyari road and tack coat with bitumen emulsi
Providing and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector from km 114.000 to 123.000 (at different stretches) on baijnath-munsiyari road and tack coat with bitumen emulsi
Read moreFdr restoration of road from thalibari to dakshin taibandal under the juridiction of kathalia sub division pwd r and b during the fy 2024 25 sh restoration of rain cuts removal of unsuitable soil patch wbm iii patch grouting patch carpeting with
Fdr restoration of road from thalibari to dakshin taibandal under the juridiction of kathalia sub division pwd r and b during the fy 2024 25 sh restoration of rain cuts removal of unsuitable soil patch wbm iii patch grouting patch carpeting with
Read moreProviding and laying 50mm bm and 30mm thick sdbc on parade to ranbireshwar temple road, ranbireshwar temple to dogra chowk via gumat and allied links in stretches and patches on eve of amarnath ji yatra 2025
Providing and laying 50mm bm and 30mm thick sdbc on parade to ranbireshwar temple road, ranbireshwar temple to dogra chowk via gumat and allied links in stretches and patches on eve of amarnath ji yatra 2025
Read moreof your Industry type