Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cpu Autobypass Actuator Talcher
|
| Description |
Cpu Autobypass Actuator Talcher
|
| Organisation | NTPC Limited(NTPC) |
| Tender Id | 2023_NTPC_78655_1 |
|
Reference Number |
NTPC/USSC-CPG3/9900263910 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | 0 |
| Place | Simhadri Super Thermal Power |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in |
| Start Date | August 12, 2023 23:30 |
| End Date |
Expired
23/08/2023
Expired 1145 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-ktps-vii stage-tm- procurement of pneumatic actuator for cpu regeneration system
Tggenco-ktps-vii stage-tm- procurement of pneumatic actuator for cpu regeneration system
Read moreSpares suitable for aira/marck make actuator operated 50nb ball valves for air lock vessels in ash handling system, ktps-vi stage
Spares suitable for aira/marck make actuator operated 50nb ball valves for air lock vessels in ash handling system, ktps-vi stage
Read moreSupply of filter elements for lp bypass hpsu and lp bypass actuator filters in tm divisions of units-i and ii of stage-i/ytps.
Supply of filter elements for lp bypass hpsu and lp bypass actuator filters in tm divisions of units-i and ii of stage-i/ytps.
Read moreTggenco-ytps(5x800mw)-cam-iv-bop-supply of bdk make body diaphragms for diaphragm valves and body seats for butterfly valves in cpu regeneration area in dm plant
Tggenco-ytps(5x800mw)-cam-iv-bop-supply of bdk make body diaphragms for diaphragm valves and body seats for butterfly valves in cpu regeneration area in dm plant
Read moreTggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Read moreConsumables for keltron make pneumatic actuator talcher
Consumables for keltron make pneumatic actuator talcher
Read moreSpares of auma actuator for talcher super thermal power station
Spares of auma actuator for talcher super thermal power station
Read moreProcurement of spares of actuator makes rmg electromech for ntpc talcher
Procurement of spares of actuator makes rmg electromech for ntpc talchersuper thermal power
Read moreProcurement of auma make actuator and its spares for ntpc talcher stps,
Procurement of auma make actuator and its spares for ntpc talcher stps,kaniha.
Read moreof your Industry type