Tender Details

Particulars Details
Title
Procurement Of Resin For Stage I Dm Plant And Cpu Stage Ii For Ntpc
Description
Procurement Of Resin For Stage I Dm Plant And Cpu Stage Ii For Ntpcfarakka
Organisation NTPC Limited(NTPC)
Tender Id 2023_NTPC_82533_1
Reference
Number
NTPC/USSC-CPG3/9900271213
Tender Fee 0
EMD 0
Tender Value -
Place Simhadri Super Thermal Power
Link
View Original Tender Notice

https://eprocurentpc.nic.in

Start Date December 19, 2023 23:35
End Date
Expired 03/01/2024

Expired 968 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Procurement of 400kv hv bushing for telk gt of stage 1 ntpc singrauli

Procurement of 400kv hv bushing for telk gt of stage 1 ntpc singrauli

Read more
Annual maintenance of real time dam level monitoring system for khep i and ii dams

Annual maintenance contract (amc) for real time dam level monitoring system installed at supa dam, bommanahalli dam, tattihalla dam, upper kaneri dam, kodasalli dam and kadra dam under khep-i & ii.

Read more
Advance work for raising of anr model-ii plantation (2027 rains) including raising pb seedlings) in salkod f sy no 396 p-i, 20ha. of honavar range during 2026-27.

Advance work for raising of anr model-ii plantation (2027 rains) including raising pb seedlings) in salkod f sy no 396 p-i, 20ha. of honavar range during 2026-27.

Read more
Consultancy services for the modification (re orientation of patch) of the stage-ii approved project involving diversion of 13.93 ha of forest land in various forest areas of sakaleshpura taluk in hassan district for implementation of yettinahole project in favour of executive engineer, karnataka neeravari nigam limited (knnl) to be issued in favour of visvesvaraya jala nigam limited (vjnl) being the administrative authority now proposal no. fp/ka/water/16795/2014(offline converting to online)

Consultancy services for the modification (re orientation of patch) of the stage-ii approved project involving diversion of 13.93 ha of forest land in various forest areas of sakaleshpura taluk in hassan district for implementation of yettinahole project in favour of executive engineer, karnataka neeravari nigam limited (knnl) to be issued in favour of visvesvaraya jala nigam limited (vjnl) being the administrative authority now proposal no. fp/ka/water/16795/2014(offline converting to online)(indent no. vjnl/2025-26/se0186/call-3)

Read more
Resurvey of hirebandady bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 25.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Resurvey of hirebandady bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 25.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Read more
Resurvey of kodiyadibeliyuru block bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 09.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Resurvey of kodiyadibeliyuru block bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 09.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Read more
Resurvey of balpa rf block bit i, ii & iii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 6.75 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Resurvey of balpa rf block bit i, ii & iii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 6.75 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.

Read more
Procurement of resin cpu at stage 2 dm plant for ntpc tanda

Procurement of resin cpu at stage 2 dm plant for ntpc tanda

Read more
Procurement of sba-resin for dm plant at stage-i and ii of ntpc sipat

Procurement of sba-resin for dm plant at stage-i and ii of ntpc sipatstps

Read more
Procurement of acid unloading pump for stage-1 dm plant stage-ii cpu

Procurement of acid unloading pump for stage-1 dm plant stage-ii cpuat ntpc dadri.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise