Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Resin For Stage I Dm Plant And Cpu Stage Ii For Ntpc
|
| Description |
Procurement Of Resin For Stage I Dm Plant And Cpu Stage Ii For Ntpcfarakka
|
| Organisation | NTPC Limited(NTPC) |
| Tender Id | 2023_NTPC_82533_1 |
|
Reference Number |
NTPC/USSC-CPG3/9900271213 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Simhadri Super Thermal Power |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in |
| Start Date | December 19, 2023 23:35 |
| End Date |
Expired
03/01/2024
Expired 968 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of 400kv hv bushing for telk gt of stage 1 ntpc singrauli
Procurement of 400kv hv bushing for telk gt of stage 1 ntpc singrauli
Read moreAnnual maintenance of real time dam level monitoring system for khep i and ii dams
Annual maintenance contract (amc) for real time dam level monitoring system installed at supa dam, bommanahalli dam, tattihalla dam, upper kaneri dam, kodasalli dam and kadra dam under khep-i & ii.
Read moreAdvance work for raising of anr model-ii plantation (2027 rains) including raising pb seedlings) in salkod f sy no 396 p-i, 20ha. of honavar range during 2026-27.
Advance work for raising of anr model-ii plantation (2027 rains) including raising pb seedlings) in salkod f sy no 396 p-i, 20ha. of honavar range during 2026-27.
Read moreConsultancy services for the modification (re orientation of patch) of the stage-ii approved project involving diversion of 13.93 ha of forest land in various forest areas of sakaleshpura taluk in hassan district for implementation of yettinahole project in favour of executive engineer, karnataka neeravari nigam limited (knnl) to be issued in favour of visvesvaraya jala nigam limited (vjnl) being the administrative authority now proposal no. fp/ka/water/16795/2014(offline converting to online)
Consultancy services for the modification (re orientation of patch) of the stage-ii approved project involving diversion of 13.93 ha of forest land in various forest areas of sakaleshpura taluk in hassan district for implementation of yettinahole project in favour of executive engineer, karnataka neeravari nigam limited (knnl) to be issued in favour of visvesvaraya jala nigam limited (vjnl) being the administrative authority now proposal no. fp/ka/water/16795/2014(offline converting to online)(indent no. vjnl/2025-26/se0186/call-3)
Read moreResurvey of hirebandady bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 25.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of hirebandady bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 25.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreResurvey of kodiyadibeliyuru block bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 09.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of kodiyadibeliyuru block bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 09.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreResurvey of balpa rf block bit i, ii & iii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 6.75 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of balpa rf block bit i, ii & iii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 6.75 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreProcurement of resin cpu at stage 2 dm plant for ntpc tanda
Procurement of resin cpu at stage 2 dm plant for ntpc tanda
Read moreProcurement of sba-resin for dm plant at stage-i and ii of ntpc sipat
Procurement of sba-resin for dm plant at stage-i and ii of ntpc sipatstps
Read moreProcurement of acid unloading pump for stage-1 dm plant stage-ii cpu
Procurement of acid unloading pump for stage-1 dm plant stage-ii cpuat ntpc dadri.
Read moreof your Industry type