Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pie Makes Spares For Stage Ii Cw Pump Reverse Rotation Monitoring System
|
| Description |
Pie Makes Spares For Stage Ii Cw Pump Reverse Rotation Monitoring Systemat Ntpc Rihand
|
| Organisation | NTPC Limited | Public Sector Undertakings |
| Tender Id | 2024_NTPC_89463_1 |
|
Reference Number |
NTPC/USSC-CPG3/9900286199 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | NTPC Rihand |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=92650 |
| Start Date | August 13, 2024 00:05 |
| End Date |
Expired
16/08/2024
Expired 677 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Nit/pom-100901 for supply of bfp pump spares
Supply of spares of bfp pump for 250mw, unit-8, ptps, panipat.
Read moreAugmentation of dry fly ash transportation system at barauni thermal power station, stage-ii (2x250 mw)
Augmentation of dry fly ash
 transportation system
 at
 barauni thermal power station, stage-ii
 (2x250 mw)
Read moreSupply of spares for sintech make pump for sugauli and lauriya
Supply of spares for sintech make pump for sugauli and lauriya
Read moreConstruction of tower for real time monitoring system at pampamala in pachakkanam fs during 2026-27 .
Construction of tower for real time monitoring system at pampamala in pachakkanam fs during 2026-27 .
Read moreDisposal of solid waste of township complex, phep-ii, nagwain for the period of one year of parbati he project (stage-ii) (package no. c-839)
Disposal of solid waste of township complex, phep-ii, nagwain for the period of one year of parbati he project (stage-ii) (package no. c-839)
Read moreSupply installation testing commissioning operation and maintenance of centralized control and monitoring system ccms for highway lighting on national highways under r and b nh wing goa on five 05 year contract basis.
Supply installation testing commissioning operation and maintenance of centralized control and monitoring system ccms for highway lighting on national highways under r and b nh wing goa on five 05 year contract basis.
Read moreRepairing, flushing, gas charging and others for proper working of ac system of hemm of gvp ph-ii ocp, kathara area as and when required basis within fy 2026-27.
Repairing, flushing, gas charging and others for proper working of ac system of hemm of gvp ph-ii ocp, kathara area as and when required basis within fy 2026-27.
Read morePie makes spares for stage ii cw pump reverse rotation monitoring system at ntpc rihand
Pie makes spares for stage ii cw pump reverse rotation monitoring system at ntpc rihand
Read moreRevival of reverse rotation monitor system in stage-3 cw pumps
Revival of reverse rotation monitor system in stage-3 cw pumps
Read moreReverse rotation switch for stage 1 cw acw pumps for ntpc rihand
Reverse rotation switch for stage 1 cw acw pumps for ntpc rihand
Read moreof your Industry type