Tender Details

Particulars Details
Title
Pre And Post Tamping Track Measurement Survey Using Trimble Gedo Vorsys Trolley System Under Aden/Aljn
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 79444558
Reference
Number
13420242025-270
Tender Fee 0
EMD 2.01 Lakh
Tender Value
Place Allahabad
Link https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79444558/viewNitPdf_4828229.pdf
Start Date January 21, 2025 22:30
End Date

13/02/2025 ( Expired 89 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Hiring of services for carrying out pre-engineering survey, rou acquisition and obtaining statutory clearance/ permission for projects in onshore assets under rate contract for a period of 3 years

Hiring of services for carrying out pre-engineering survey, rou acquisition and obtaining statutory clearance/ permission for projects in onshore assets under rate contract for a period of 3 years

Read more
Budgetary quotation for recapitalization of remote control and monitoring system with 03 years warranty and 07 years post camc under sri vijaya puram directorate

Budgetary quotation for recapitalization of remote control and monitoring system with 03 years warranty and 07 years post camc under sri vijaya puram directorate

Read more
Provn of interlocking tiles at or line, mess, guest room and sigcen washroom of 402 (i) arty bde sig coy at nurla mil stn under age (i) nimu and provn of sign post along the existing track and living area of 72 arty bde camp under age (i) nimu

Provn of interlocking tiles at or line, mess, guest room and sigcen washroom of 402 (i) arty bde sig coy at nurla mil stn under age (i) nimu and provn of sign post along the existing track and living area of 72 arty bde camp under age (i) nimu

Read more
Periodical maintenance of pmgsy roads under performance incentive (post dlp) on shiva to gharan road km 0/0 to 10/100 (sh- providing and laying renewal coat using 25 mm thick bituminous concrete surfacing in km 0/0 to 10/100 and five year maintenance

Periodical maintenance of pmgsy roads under performance incentive (post dlp) on shiva to gharan road km 0/0 to 10/100 (sh- providing and laying renewal coat using 25 mm thick bituminous concrete surfacing in km 0/0 to 10/100 and five year maintenance

Read more
Appointment of project management consultant for pre and post tender activities for kharadi survey no. 68-69 river bridge development.

Appointment of project management consultant for pre and post tender activities for kharadi survey no. 68-69 river bridge development.

Read more
Appointment of consultant for pre consultancy and post consultancy for the work.

Desilting&amp#x0d and rehabilitation of dia 990 to 1143 mm dia sewer line by structural liner method&amp#x0d from shanti path to satya sadan madhu limaye marg via kautilya marg and along kushak&amp#x0d nallah under phase-iii.

Read more
Mirik bye pass road from kmp 0.00 to 3.30 for pre and post monsoon work drain clearance and jungle cutting

Mirik bye pass road from kmp 0.00 to 3.30 for pre and post monsoon work, drain clearance and jungle cutting under darjeeling highway division in the district of darjeeling during the year 2025-26

Read more
Pre-bid tie up for transmission line package tl01 associated with establishment of intra-state transmission system for execution of system strengthening upgradation works and intra-state transmission system projects by creation/augmentation of grid stations and laying of transmission lines in the state of j&k under tbcb route

Pre bid tie up for transmission line package tl01 associated with establishment of intra state transmission system for execution of system strengthening upgradation works and intra-state transmission system projects by creation/augmentation of grid stations and laying of transmission lines in the state of jk. under tbcb route

Read more
Ae-168 attending pothole/bad patches by using mastic asphalt pre-monsoon, during and post-monsoon on various roads havingwidth less than 9 mtrs (including roads having width less than 6 mtr.) at ward level in l, m/east and m/west wards in zone-v

Ae-168 attending pothole/bad patches by using&amp#x0d mastic asphalt pre-monsoon, during and postmonsoon&amp#x0d on various roads having width less than 9&amp#x0d mtrs. (including roads having width less than 6 mtr.)&amp#x0d at ward level in l, m/east and m/west wards in zone-v

Read more
Ae 169 attending pothole/bad patches by using mastic asphalt pre-monsoon, during and post-monsoon onvarious roads having width more than 9 mtrs n,s and t ward z-vi

Ae 169 attending pothole/bad patches by using mastic asphalt pre-monsoon, during and post-monsoon onvarious roads having width more than 9 mtrs n,s and t ward z-vi

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise