Tender Details
Particulars | Details |
---|---|
Title |
Pre And Post Tamping Track Measurement Survey Using Trimble Gedo Vorsys Trolley System Under Aden/Aljn
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79444558 |
Reference Number |
13420242025-270 |
Tender Fee | 0 |
EMD | 2.01 Lakh |
Tender Value | |
Place | Allahabad |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79444558/viewNitPdf_4828229.pdf |
Start Date | January 21, 2025 22:30 |
End Date |
13/02/2025 ( Expired 89 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Hiring of services for carrying out pre-engineering survey, rou acquisition and obtaining statutory clearance/ permission for projects in onshore assets under rate contract for a period of 3 years
Hiring of services for carrying out pre-engineering survey, rou acquisition and obtaining statutory clearance/ permission for projects in onshore assets under rate contract for a period of 3 years
Read moreBudgetary quotation for recapitalization of remote control and monitoring system with 03 years warranty and 07 years post camc under sri vijaya puram directorate
Budgetary quotation for recapitalization of remote control and monitoring system with 03 years warranty and 07 years post camc under sri vijaya puram directorate
Read moreProvn of interlocking tiles at or line, mess, guest room and sigcen washroom of 402 (i) arty bde sig coy at nurla mil stn under age (i) nimu and provn of sign post along the existing track and living area of 72 arty bde camp under age (i) nimu
Provn of interlocking tiles at or line, mess, guest room and sigcen washroom of 402 (i) arty bde sig coy at nurla mil stn under age (i) nimu and provn of sign post along the existing track and living area of 72 arty bde camp under age (i) nimu
Read morePeriodical maintenance of pmgsy roads under performance incentive (post dlp) on shiva to gharan road km 0/0 to 10/100 (sh- providing and laying renewal coat using 25 mm thick bituminous concrete surfacing in km 0/0 to 10/100 and five year maintenance
Periodical maintenance of pmgsy roads under performance incentive (post dlp) on shiva to gharan road km 0/0 to 10/100 (sh- providing and laying renewal coat using 25 mm thick bituminous concrete surfacing in km 0/0 to 10/100 and five year maintenance
Read moreAppointment of project management consultant for pre and post tender activities for kharadi survey no. 68-69 river bridge development.
Appointment of project management consultant for pre and post tender activities for kharadi survey no. 68-69 river bridge development.
Read moreAppointment of consultant for pre consultancy and post consultancy for the work.
Desilting&#x0d and rehabilitation of dia 990 to 1143 mm dia sewer line by structural liner method&#x0d from shanti path to satya sadan madhu limaye marg via kautilya marg and along kushak&#x0d nallah under phase-iii.
Read moreMirik bye pass road from kmp 0.00 to 3.30 for pre and post monsoon work drain clearance and jungle cutting
Mirik bye pass road from kmp 0.00 to 3.30 for pre and post monsoon work, drain clearance and jungle cutting under darjeeling highway division in the district of darjeeling during the year 2025-26
Read morePre-bid tie up for transmission line package tl01 associated with establishment of intra-state transmission system for execution of system strengthening upgradation works and intra-state transmission system projects by creation/augmentation of grid stations and laying of transmission lines in the state of j&k under tbcb route
Pre bid tie up for transmission line package tl01 associated with establishment of intra state transmission system for execution of system strengthening upgradation works and intra-state transmission system projects by creation/augmentation of grid stations and laying of transmission lines in the state of jk. under tbcb route
Read moreAe-168 attending pothole/bad patches by using mastic asphalt pre-monsoon, during and post-monsoon on various roads havingwidth less than 9 mtrs (including roads having width less than 6 mtr.) at ward level in l, m/east and m/west wards in zone-v
Ae-168 attending pothole/bad patches by using&#x0d mastic asphalt pre-monsoon, during and postmonsoon&#x0d on various roads having width less than 9&#x0d mtrs. (including roads having width less than 6 mtr.)&#x0d at ward level in l, m/east and m/west wards in zone-v
Read moreAe 169 attending pothole/bad patches by using mastic asphalt pre-monsoon, during and post-monsoon onvarious roads having width more than 9 mtrs n,s and t ward z-vi
Ae 169 attending pothole/bad patches by using mastic asphalt pre-monsoon, during and post-monsoon onvarious roads having width more than 9 mtrs n,s and t ward z-vi
Read moreof your Industry type