Tender Details
Particulars | Details |
---|---|
Title |
Pre And Post Tamping Track Measurement Survey Using Trimble Gedo Vorsys Trolley System Between Ldh Jrc (Up &Amp Dn Line) In The Jurisdiction Of Aden/Ldh.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78994942 |
Reference Number |
268-2024-25-ADEN-LDH |
Tender Fee | 0 |
EMD | 39600 |
Tender Value | |
Place | New Delhi |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78994942/viewNitPdf_4804936.pdf |
Start Date | December 13, 2024 22:05 |
End Date |
07/01/2025 ( Expired 105 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Pre and post tamping track measurement survey using trimble gedo vorsys trolley system between agra fort - bandikui section 150km, bhandai flyover etawah bound down train (10km) and any other location in the jurisdiction of agra/construction unit.
For complete deion and other details, please refer to tender
Read moreThrough rail renewal (primary) for 11.354 km. from km. 293.162 - km. 400.302 (in patches) on dn. line and complete track renewal (secondary) on loop lines of various yards for 5.557 km. between malligura - kirandul stations under the jurisdiction of sr.den (west)/wat on kk- ii line of waltair division.
For complete deion and other details, please refer to tender
Read morePre and post tamping track measurement survey using gedo trolley system or similar in the jurisdiction of sr. den-iii/mb.
For complete deion and other details, please refer to tender
Read moreEmergency traffic restoration works such as land slide,sinkage, slope failure, bank settlement during monsoon & other related works during pre/post monsoon, construction & repairing/cleaning of catch water/side drain & waterways & track maintenance work at vulnerable location in lmg-cne hill under the jurisdiction of aden/iii/lmg for one year.
For complete deion and other details, please refer to tender
Read moreEmergency traffic restoration works such as land slide,sinkage, slope failure, bank settlement during monsoon & other related works during pre/post monsoon, construction & repairing/cleaning of catch water/side drain & waterways & track maintenance work at vulnerable location in lmg-cne hill under the jurisdiction of aden/hgs for one year.
For complete deion and other details, please refer to tender
Read moreExecution of p.way and allied works like pre-post tamping, realignment of curves, overhauling of plain track & lc etc. under jurisdiction of aden/sbp.
For complete deion and other details, please refer to tender
Read moreExecution of p.way and allied works like pre-post tamping, realignment of curves, overhauling of plain track & lc etc. under jurisdiction of aden/rair.
For complete deion and other details, please refer to tender
Read moreAhmedabad - viramgam - samakhiyali section - pre & post tamping track measurement survey using timble gedo vorsys trolley system in the jurisdiction of senior divisional engineer (west) - ahmedabad.
For complete deion and other details, please refer to tender
Read moreMitha-samakhiali section - pre & post tamping track measurement survey using timble gedo vorsys trolley system in the jurisdiction of den(nw)-adi.
For complete deion and other details, please refer to tender
Read moreMaintenance of bg track including lifting and packing , boxing and profiling, pulling back of rails / panels, anti-corrosive painting, de-stressing ,slewing and realigning of curves, overhauling,removing weeds & bushes, cleaning of side drains , carrying out pre-tamping, during tamping and post-tamping works and other ancillary works ( excluding agtl yard ) in betwwen agtl-sbrm section under the jurisdiction of aden/agtl for a period of 2 years.
For complete deion and other details, please refer to tender
Read moreof your Industry type