Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pre And Post Tamping Track Measurement Survey Using Trimble Gedo Vorsys Trolley System For Design Mode Tamping In The Section Of Aden 1/Fzr.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78930951 |
|
Reference Number |
260-2024-25-ADEN-1-FZR |
| Tender Fee | 0 |
| EMD | 39600 |
| Tender Value | |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78930951/viewNitPdf_4801303.pdf |
| Start Date | December 10, 2024 22:13 |
| End Date |
Expired
01/01/2025
Expired 540 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreEoi document for selection of consortium partner for design supply installation testing commissioning and operation maintenance of atms projects in zone1 delhi region on epc mode
Eoi document for selection of consortium partner for design supply installation testing commissioning and operation maintenance of atms projects in zone1 delhi region on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreHiring of light commercial tax permit vehicles running on petrol diesel ac system at mjp circle office division office and sub division offices for the period of 1 year including monthly basis with service of driver fuel maintainance of vehicle
Hiring of light commercial tax permit vehicles running on petrol diesel ac system at mjp circle office division office and sub division offices for the period of 1 year including monthly basis with service of driver fuel maintainance of vehicle
Read morePre & post tamping track measurement survey using trimble gedo vorsys trolley system.
For complete deion and other details, please refer to tender
Read morePre and post tamping track measurement survey using trimble gedo vorsys trolley system under aden/aljn
For complete deion and other details, please refer to tender
Read morePre and post tamping track measurement survey using trimble gedo vorsys trolley system for design mode tamping in asr & juc sub division under den-iii/fzr.
For complete deion and other details, please refer to tender
Read morePre and post tamping track measurement survey using trimble gedo vorsys trolley system between cnb-rrh section under aden/line/cnb.
For complete deion and other details, please refer to tender
Read moreof your Industry type