Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting And Replacing Overhead Tank From 8 Pit To Near Tar Plant Ground After Dismantling Existing Pipe 5 Nos. Pipe And 02 Nos. Bend And Refitting At Near Tar Plant And Matching With Existing Pipe Line For Islampur And Other Colonies At Lodna Colli
|
| Description |
Shifting And Replacing Overhead Tank From 8 Pit To Near Tar Plant Ground After Dismantling Existing Pipe 5 Nos. Pipe And 02 Nos. Bend And Refitting At Near Tar Plant And Matching With Existing Pipe Line For Islampur And Other Colonies At Lodna Colli
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_293827_1 |
|
Reference Number |
BCCL/LA/EnM/F-19/23-24/205 |
| Tender Fee | - |
| EMD | 2208 |
| Tender Value | - |
| Place | GM Office Lodna Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | November 16, 2023 15:30 |
| End Date |
Expired
27/11/2023
Expired 1057 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Echp-i- replacing the existing worn out bend chutes by new bend chutes for pc-1a 1b at pch-i.
Echp-i- replacing the existing worn out bend chutes by new bend chutes for pc-1a 1b at pch-i.
Read moreReplacement of take-up pulley drum assembly and bend pulley drum assembly after dismantling of existing worn-out drum for unit-701 belt conveyor and refitting of all its accessories at moonidih coal washery.
Replacement of take-up pulley drum assembly and bend pulley drum assembly after dismantling of existing worn-out drum for unit-701 belt conveyor and refitting of all its accessories at moonidih coal washery.
Read moreReplacement of sliding pulley drum assembly and bend pulley drum assembly after dismantling of existing worn-out drum unit 502 and 704 belt conveyor and refitting of all its accessories at moonidih coal washery.
Replacement of sliding pulley drum assembly and bend pulley drum assembly after dismantling of existing worn-out drum unit 502 and 704 belt conveyor and refitting of all its accessories at moonidih coal washery.
Read moreRepairing, renovation and up-gradation of hvac cooling tower with replacing existing spare parts including replacment of damaged water pipeline with ppr green pipe at islampur ssh, district uttar dinajpur.
Repairing, renovation and up-gradation of hvac cooling tower with replacing existing&#x0d spare parts including replacment of damaged water pipeline with ppr green pipe at&#x0d islampur ssh, district uttar dinajpur.
Read moreDeposit-rurban agglomeration- 2021 -2022 restoration of tar cut for replacing existing line with 160mm pvc pipe for improving water supply to killippalam iranimuttam bund road from chainage ch1-750 to ch2-250-general civil work
Deposit-rurban agglomeration- 2021 -2022 restoration of tar cut for replacing existing line with 160mm pvc pipe for improving water supply to killippalam iranimuttam bund road from chainage ch1-750 to ch2-250-general civil work
Read moreDeposit restoration of tar cut taken by kwa for providing 160mm pipe line in killippalam iranimuttom bund road phase-2-second phase 2022-23-urban agglomeration replacing existing line with 160mm pvc pipe for improving water supply to bund road of n
Deposit restoration of tar cut taken by kwa for providing 160mm pipe line in killippalam iranimuttom bund road phase-2-second phase 2022-23-urban agglomeration replacing existing line with 160mm pvc pipe for improving water supply to bund road of n
Read moreof your Industry type