Tender Details
Particulars | Details |
---|---|
Title |
General Annual Maintenance Of Mannar 2 L I Station (Mechanical Works) Maintenance Of Mannar 2 L I Station (2023 24) Under M I Section,Thiruvalla General Civil Work
|
Description |
Charges For Overhauling,Repairing Pump,Motor And Pump Alignment,Supplying 16mm Copper Wire Etc.
|
Organisation | Government of Kerala |
Tender Id | 2023_Irrig_614600_1 |
Reference Number |
20/e-T/AEE/MI/TVLA/2023-24 |
Tender Fee | 555 |
EMD | 2320 |
Tender Value | |
Place | M I Sub Division,Thiruvalla |
Link | https://etenders.kerala.gov.in |
Start Date | October 19, 2023 22:30 |
End Date |
30/10/2023 ( Expired 571 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreWork of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreAnnual maintenance contract for civil maintenance and minor works at plant, corporate office, amtl and hostel - as per cpwd-dsr (2023 rates) for midhani
Annual maintenance contract for civil maintenance and minor works at plant, corporate office, amtl and hostel - as per cpwd-dsr (2023 rates) for midhani
Read moreUpgradation of road from mrlo1-nh-o8 (peratia bazar) to garjee bazar (nh) via kalaban bazar, package no- tr-06-03 p3 (length. 11.04 km) under matabari block (3rd call) dnit no 28/eo/pmgsy-iii batch-i, 2023- 24/trrda/2025-26
Pmgsy iii works
Read moreUpgradation of road rrom mrl07-amarpur udaipur road near gamaria para to lovestory bazar road via gamaria adc office, package no-tr-06-02 p3 (length-5.309 km) under matabariblock. dnit no 27/eo/pmgsy-iii batch-i, 2023- 24)/trrda/2025-26
Pmgsy iii works
Read moreRoutine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Read moreRound the clock operation, maintenance and overhauling of central ac plants of ucb, 220 kv switchyard control room, package ac plants, air washer systems and maintenance and overhauling of window/split acs, water coolers, ros. all connected piping,
Valves etc. of stage-i and stage-ii, ghtp, lehra-mohabbat and mtc. work of acs/ros systems etc. gndtp, bathinda falling under mechanical aux. mtc. cell on lump-sum basis.lehra-mohabbat and mtc. work of acs/ros systems etc. gndtp, bathinda falling
Read moreConstrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.
Constrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.
Read moreRequest for pre qualification (rfq) 2025 for the maintenance works to be taken up by authority / risk and cost work of the concessionaire/ contractor under regional office, raipur
Request for pre qualification (rfq) 2025 for the maintenance works to be taken up by authority / risk and cost work of the concessionaire/ contractor under regional office, raipur
Read moreof your Industry type