Tender Details
Particulars | Details |
---|---|
Title |
26(1)/Ae/Bfsd/Ibbz I/Jal/2024 25/122
|
Description |
Con Of Border Security Fencing From Phase Ii/Iii To New Design Fence In West Bengal Between Bp No. 243/Mp To 764/2 S Length 210.028 Km Sh Between Bp No. 742/9 S To 764/2 S 35.03 Km I/C Intermediate Bo Ps Reverine Structures Like Bridges, Culverts I/C Gaps In The Fences And Length Of Existing Old Fences Which Are Not In The Scope Of This Work Etc. Along Indo Bangladesh Border In The Dist. Of Jalpaiguri, W.B. Package Iii In Epc Mode Iii Sh Misc. Work In The Office Of The Assistant Engineer Iii Bfsd, Cpwd, Jalpaiguri.
|
Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
Tender Id | 96259 |
Reference Number |
26(1)/AE/BFSD/IBBZ-I/JAL/2024-25/122 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | |
Link | https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=6370776424637077642439363235392432362831292f41452f424653442f4942425a2d492f4a414c2f323032342d32352f313232 |
Start Date | December 07, 2024 22:32 |
End Date |
11/12/2024 ( Expired 151 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewCon of border security fencing from phase-ii/iii to new design fence in west bengal between bp no. 243/mp to 764/2-s (length 210.028 km). sh- in various stretches from bp no. 355/2-s to 371/1-s (4.725 km), 361/m to 365/m (6.329 km), 385/2-s to 385/5-s (0.800 km) near bp no. 399/8-r (0.030 km), 401/6-s to 402/2-s (0.180 km) and 409/5-s to 417/8-s (15.383 km). ( total length 27.447 km including intermediate bops: reverine structures like bridges, culverts including gaps in fences and length of existing old fences which are not in the scope of this work etc.) along indo-bangladesh border in the district of uttar dinajpur , west bengal (package-v) in epc mode-iii. (sw- sitc of 5 no. 1.5 tr split type ac with iei and voltage stabilizers in the division offices of bfd-ii, cpwd , islampur, chargeable to work contingencies)
Read more26(1)/ae/bfsd/ibbz-i/jal/2025-26/18
Upgradation/replacement of border security fenc from phase-ii to new design fence in various stretches from bp no. 764/2-s to 774/2-s(length-20.668 km)in the state of west bengal along indo-bangladesh border (ibb) sh-strengthening of ibb fence in bd side in aor of 93 bn
Read more12/ee/bfd-ii/ae-bfsd-i kaliyaganj/2024-25
Con of border security fencing from phase ii/iii to new design fencing in west bengal between bp no. 243/mp to 764/2 s (length 210.028 km.) sh between bp no. 328/4 s to 332/7 s and 347/ 2 s to 355/2 s (27.709 km including intermediate bops reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc.) along ibb in the district of uttar dinajpur wb. (package iv) in epc mode iii. sw. providing services of one computer /data entry operator and one runner for the office of assistant engineer bfsd i, under bfd ii, ibbz i, cpwd, kaliyaganj, uttar dinajpur, west bengal.
Read more06/nit/ae/bfsd-iii/cpwd/2024-25
Con of border security fencing from phase ii/ iii to new design fence in west bengal between bp no. 243/mp to 764/2-s (length 210.028 km.) (package-vi, length-24.88 km. package-vii, length: 22.51 km). sh: providing services of one inspection vehicle (mahindra scorpio-n, xuv-500/700, marazzo, tata harrier or equivalent make) for government duty at office of the executive engineer, border fencing division-viii, ibbz-i, cpwd, balurghat, dakshin dinajpur, west bengal.
Read more05/nit/ae/bfsd-iii/cpwd/2024-25
Con of border security fencing from phase-ii/iii to new design fence in west bengal between bp no. 243/mp to 764/2-s (length: 210.028 km.) (package-vi, length-24.88 km package-vii, length-22.51 km.) sh: providing services of one inspection vehicle (scorpio, bolero or equivalent make) for government duty at office of the assistant engineer, border fencing sub division-iii, bfd-viii, ibbz-i, cpwd, balurghat, dakshin dinajpur, west bengal,
Read more08/nit/ee/bfd-ii/2024-25(3rd call)
Con of border security fencing from phase ii/iii to new design fence in west bengal between bp. no. 243/mp to 764/2-s (length 210.028 km) sh between bp. no. 328/4-s to 332/7-s and 347/2-s to 355/2-s (27.709 km including intermediate bops, reverine structure like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc. ) along indo bangladesh border in the district of uttar dinajpur, west bengal (package-iv) in epc mode-iii. (sw providing services of sel driven inspection vehicle like toyota innova crysta or equivalent on monthly hire basis for government duty of superintending engineer, bfc-i, ibbz-i, cpwd, siliguri, west bengal.
Read moreAe/bfsd-iii/cpwd/niq/2024-25/220
Con of border security fencing from phase ii/iii to new design fence in west bengal between bp. no. 243/mp to 764/2-s (length 210.028 km) sh in various stretches from bp. no. 355/2-s to 357/1-s (4.725 km), 361/m to 365/m (6.329 km), 385/2-s to 385/5-s (0.800 km), near bp. no. 399/8-r (0.030 km), 401/6-s to 402/2-s (0.180 km) and 409/5-s to 417/8-s (15.383 km) (total length 27.447 km including intermediate bops reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc. along indo-bangladesh border in the district of uttar dinajpur, west bengal. (package-v) in epc mode-iii. sw washing, mopping and cleaning etc. manually at bfd-ii, ibbz-i, cpwd, islampur division during 2024-25.
Read more08/nit/ee/bfd-ii/2024-25(2nd call)
Con of border security fencing from phase ii/iii to new design fence in west bengal between bp. no. 243/mp to 764/2-s (length 210.028 km) sh between bp. no. 328/4-s to 332/7-s and 347/2-s to 355/2-s (27.709 km including intermediate bops, reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc.) along indo bangladesh border in the district of uttar dinajpur, west bengal (package-iv) in epc mode-iii. sw -providing services of sel driven inspection vehicle like toyota innova crysta or equivalent on monthly hire basis for government duty of superintending engineer, bfc-i, ibbz-i, cpwd, siliguri, west bengal.
Read more08/nit/ee/bfd-ii/2024-25
Con of border security fencing from phase-ii/iii to new design fence in west bengal between bp. no. 243/mp to 764/2-s (length 210.028 km) sh between bp. no. 328/4-s to 332/7-s and 347/2-s to 355/2-s (27.709 km including intermediate bops, reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc.)along indo bangladesh border in the district of uttar dinajpur, west bengal package-iv in epc mode iii. sw providing services of sel driven inspection vehicle like toyota innova crysta or equivalent on monthly hire basis for government duty of superintending engineer, bfc-i, ibbz-i, cpwd, siliguri, west bengal.
Read more05/ee/bfd-ii/bfsd-iii/2024-25 (3rd call)
Con of border security fencing from phase-ii/iii to new design fence in west bengal between bp. no. 243/mp to 764/2-s (length 210.028 km). sh- in various stretches from bp no. 355/2-s to 357/1-s (4.725 km), 361/m to 365/m (6.329 km), 385/2-s to 385/5-s (0.800 km), near bp no. 399/8-r (0.030 km), 401/6-s to 402/2-s (0.180 km) and 409/5-s to 417/8-s (15.383 km) (total length 27.447 km including intermediate bops, reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc) along indo bangladesh border in the district of uttar dinajpur, west bengal (package-v) in epc mode-iii. sh- providing services of watch ward for the o/o the executive engineer, bfd-ii assistant engineer, bfsd-islampur, cpwd, ibbz-i, islampur.
Read moreof your Industry type