Tender Details
Particulars | Details |
---|---|
Title |
New Construction Of Kundasar Mahasi Nanapara Mdr Km 71 To Mahmullapur Via Loniyanpurwa Link Road And 1x4.00x4.00m Box Culvert At Local Nala And 5x2.00x2.00m Box Culvert At Location Of Dip In District Bahraich(vidhansabha Nanpara)
|
Description |
New Construction Of Kundasar Mahasi Nanapara Mdr Km 71 To Mahmullapur Via Loniyanpurwa Link Road And 1x4.00x4.00m Box Culvert At Local Nala And 5x2.00x2.00m Box Culvert At Location Of Dip In District Bahraich(vidhansabha Nanpara)
|
Organisation | Chief Engineer Devipatan (Gonda) Zone PWD Gonda | State Govt. and UT |
Tender Id | 2025_CEDPW_1017705_2 |
Reference Number |
892/8 Kam/e_Tendering/2024-25 Dated 20-02-2025 |
Tender Fee | 2715 |
EMD | 11.06 Lakh |
Tender Value | |
Place | Bahraich |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1834943 |
Start Date | March 15, 2025 19:30 |
End Date |
26/03/2025 ( Expired 27 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreConstruction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreConstruction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Read moreCrif - construction of thadiyanpadu bridge periyar river connecting nh-185 to state road mdr in idukki district in the state of kerala civil work general civil work
Construction of thadiyanpadu bridge across periyar river connecting nh-185 to state road (mdr) in idukki district in the state of kerala - construction of bridge and amenities
Read moreConstruction of 220/132 kv, 2 x 160 mva and 132/33kv 2 x 50 mva, 220/132/33 kv gis substation at gokul nagar (kalwar road) in jaipur district alongwith associated lines including survey, supply of all equipments/materials, erection (including civil w
Construction of 220/132 kv, 2 x 160 mva and 132/33kv 2 x 50 mva, 220/132/33 kv gis substation at gokul nagar (kalwar road) in jaipur district alongwith associated lines including survey, supply of all equipments/materials, erection (including civil
Read moreImprovements and widening of the road mrl09-padappai kavanur road via orathur km 0/0 - 4/020 at kundrathur panchayat union in kanchipuram district under pmgsy iii - batch i - 2024-25. pkg.no.tn01-154
Improvements and widening of the road mrl09-padappai kavanur road via orathur km 0/0 - 4/020 at kundrathur panchayat union in kanchipuram district under pmgsy iii - batch i - 2024-25. pkg.no.tn01-154
Read moreConstruction and widening of existing narrow culvert on irrigation canal at km 115.030 of nh 327e under nh division purnea in the state of bihar for year 2024-25. (job no- nh -327e/br/2024-25/117
Construction and widening of existing narrow culvert on irrigation canal at km 115.030 of nh 327e under nh division purnea in the state of bihar for year 2024-25. (job no- nh -327e/br/2024-25/117
Read moreUpgradation and 5 years routine maintenance of mrl-32 aruppukottai - valinokkam road to maravarperungudi (via) thummuchinnampatti road in package no. tn28-135 at thiruchuli block of virudhunagar district under pmgsy-iii (2024-25)-batch-i
Upgradation and 5 years routine maintenance of mrl-32 aruppukottai - valinokkam road to maravarperungudi (via) thummuchinnampatti road in package no. tn28-135 at thiruchuli block of virudhunagar district under pmgsy-iii (2024-25)-batch-i
Read moreUpgradation and 5 years routine maintenance of mrl-30 - kallikudi - thiruchuli road to srirampoor - thamaraikulam road (via) kilavaneri road in package no. tn28-134 at kariapatti block of virudhunagar district under pmgsy-iii (2024-25)-batch-i
Upgradation and 5 years routine maintenance of mrl-30 - kallikudi - thiruchuli road to srirampoor - thamaraikulam road (via) kilavaneri road in package no. tn28-134 at kariapatti block of virudhunagar district under pmgsy-iii (2024-25)-batch-i
Read moreConstruction of infrastructure and development work lgsf (light gauge steel framed) building at new itbp camp dobala situated in lapthal valley approx. height 14694 ft and approx. 126 km from 1st bn joshimath, distt chamoli (ukd) connected by metaled
Construction of infrastructure and development work lgsf (light gauge steel framed) building at new itbp camp dobala situated in lapthal valley approx. height 14694 ft and approx. 126 km from 1st bn joshimath, distt chamoli (ukd) connected by metaled
Read moreof your Industry type