Tender Details

Particulars Details
Title
Proposed Lhs Of Box Size (1x5.0x4.5m) At Kms. 415/17 19 Between Jalgaon Srisoli Station On Igp Bsl Section (Girna Subway On Deposit Work, Pwd Jalgaon)
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 78710597
Reference
Number
DRMWBSL392024t2
Tender Fee 0
EMD 3.02 Lakh
Tender Value
Place Mumbai CST
Link https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78710597/viewNitPdf_4788604.pdf
Start Date December 06, 2024 21:48
End Date

07/01/2025 ( Expired 125 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design, supply and fixing of pre-cast rcc box culvert size 2.00 m x 2.00 m (nhsl specification 7.45 mtr width) including earth work excavation, pcc bed and protection works between km 0.00 to km 14.350 on puwarti-gomaguda road

Design, supply and fixing of pre-cast rcc box culvert size 2.00 m x 2.00 m (nhsl specification 7.45 mtr width) including earth work excavation, pcc bed and protection works between km 0.00 to km 14.350 on puwarti-gomaguda road

Read more
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Read more
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Read more
Work of inter connection and removel of water pollution on various size pipe lines at section baswa under sub division bandikui

Work of inter connection and removel of water pollution on various size pipe lines at section baswa under sub division bandikui

Read more
Work of inter connection and removel of water pollution on various size pipe lines in rural area at section bandikui under sub division

Work of inter connection and removel of water pollution on various size pipe lines in rural area at section bandikui under sub division&amp#x0d bandikui&amp#x0d

Read more
Providing and laying ctsb, eta, tack coat, b.c. etc. work in viaduct portion and r.e.wall portion of 2 lane r.o.b. in lieu x-ing no-7c at km 846/23-25 on near saiyed sarawan railway station of north central railway on pry-cnb section in district kaus

Providing and laying ctsb, eta, tack coat, b.c. etc. work in viaduct portion and r.e.wall portion of 2 lane r.o.b. in lieu x-ing no-7c at km 846/23-25 on near saiyed sarawan railway station of north central railway on pry-cnb section in district kaus

Read more
Const. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).

Const. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).

Read more
Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode

Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode

Read more
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway

Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway

Read more
Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross

Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise