Tender Details

Particulars Details
Title

AAAAAAAAAA

Login to view
Description
Construction Of Concrete Drain With Slab From Karur Vysya Bank To Ranjit Barman House
Organisation Zilla Parishad | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 1500
EMD 23694
Tender Value
Place GHOSHPARA BAZAR
Link

AAAAAAAAAA

Login to view
Start Date June 30, 2025 20:30
End Date

10/07/2025 ( 6 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Invitation of bids to develop petroleum and petroleum product (lpg) pipeline from mumbai to jalgaon with a spur from nasik to aurangabad

Grant of authorization for laying, building, operating or expanding petroleum and petroleum product pipeline from mumbai to jalgaon with a spur from nasik to aurangabad

Read more
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26

Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26

Read more
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod

Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod

Read more
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)

Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)

Read more
Consultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti

Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.

Read more
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Read more
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh

Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise