Tender Details
Particulars | Details |
---|---|
Title |
Nit No. 24/2024 25 Deposit Work Of Shifting Of Pipe Line Under The Construction Of Railway Under Bridge (Rub) At Railway Level Crossing No. C 39 Of Shri Balaji Railway Station Yard.
|
Description |
Deposit Work Of Shifting Of Pipe Line Under The Construction Of Railway Under Bridge (Rub) At Railway Level Crossing No. C 39 Of Shri Balaji Railway Station Yard.
|
Organisation | PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT |
Tender Id | 2024_PHCJA_411674_1 |
Reference Number |
NIT No. 24/2024-25 EE Nagaur |
Tender Fee | 1500 |
EMD | 7360 |
Tender Value | |
Place | Executive Engineer, PHED Div. Nagaur |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=740817 |
Start Date | August 06, 2024 23:30 |
End Date |
12/08/2024 ( Expired 280 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Inviting rate for all kind of lt line extentin and shifting of lines transformers and other electrical work on mpuadd issr 02.08.2021 sor all item
Inviting rate for all kind of lt line extentin and shifting of lines transformers and other electrical work on mpuadd issr 02.08.2021 sor all item
Read moreMtc of type ii iii and iv qtr total 24 nos under kumarghat sub divisional hospital during the year 2024 25 sh r c c work finishing work water supply and sanitary line etc
Mtc of type ii iii and iv qtr total 24 nos under kumarghat sub divisional hospital during the year 2024 25 sh r c c work finishing work water supply and sanitary line etc
Read moreConstruction of 02 lane rail over bridge at level crossing no 300-spl chowka ghat budhwal block section km713 16 18 on gonda lucknow n.e. railway rail section in distt barabanki on epc mode
Construction of 02 lane rail over bridge at level crossing no 300-spl chowka ghat budhwal block section km713 16 18 on gonda lucknow n.e. railway rail section in distt barabanki on epc mode
Read moreConstruction of 02-lane road over bridge in lieu of level crossing no. 556a at km. 1457/14-16 in the agra-palwal section of agra division of north central railway
Construction of 02-lane road over bridge in lieu of level crossing no. 556a at km. 1457/14-16 in the agra-palwal section of agra division of north central railway
Read moreNecessary maintenance, repair and safety work to make 01 additional old line line no 01 of r and d yard operational for coal racks as a temporary arrangement under railway siding of panki thermal extension project, panki, kanpur
Necessary maintenance, repair and safety work to make 01 additional old line line no 01 of r and d yard operational for coal racks as a temporary arrangement under railway siding of panki thermal extension project, panki, kanpur
Read moreConstruction of concrete drain from basun gahrui konda to interdanga bridge within mongalpur gp, under indas block under 15th fc tied fund (2025-26) under bankura zilla parishad.(2nd call of nit-52 of 2024-25,sl. no. 4)
Construction of concrete drain from basun gahrui konda to interdanga bridge within mongalpur gp, under indas block under 15th fc tied fund (2025-26) under bankura zilla parishad.(2nd call of nit-52 of 2024-25,sl. no. 4)
Read moreWater line shifting work at shivpuri pohri road railway crossing no 59 c
Water line shifting work at shivpuri pohri road railway crossing no 59 c
Read moreZone no. 03, ward no.10, 11, 12, 13, 14, 15, 16, 22, 23, 24 and 25, providing and laying of hume pipe and construction of wbm road (piece work) in different places.
Zone no. 03, ward no.10, 11, 12, 13, 14, 15, 16, 22, 23, 24 and 25, providing and laying of hume pipe and construction of wbm road (piece work) in different places.
Read moreWork of 33 kv underground cabling (33 kv xlpe cable, 3x300 mm) (02 nos.) for railway crossing at nad-ujn sec. bet station pso-asl station track location no. 31/10-11 as per layout drawing under sanction project by onm dn barnagar
Work of 33 kv underground cabling (33 kv xlpe cable, 3x300 mm) (02 nos.) for railway crossing at nad-ujn sec. bet station pso-asl station track location no. 31/10-11 as per layout drawing under sanction project by onm dn barnagar
Read moreElectrical utility shifting work due to erection of fly over bridge by railway in atarra-badausa station under edd, atarra
Electrical utility shifting work due to erection of fly over bridge by railway in atarra-badausa station under edd, atarra
Read moreof your Industry type