Tender Details

Particulars Details
Title
Construction Of 22 Unit Of Community Leach Pit With Silt Chamber For 05 Nos Of Hh At Imis Village Saktigarh
Description
Construction Of 22 Unit Of Community Leach Pit With Silt Chamber For 05 Nos Of Hh At Imis Village Saktigarh Within Barsul Ii Gram Panchayat Under Burdwan Ii Panchayat Samity
Organisation Government of West Bengal
Tender Id 2023_ZPHD_604965_12
Reference
Number
1302/BWN-II P.S.
Tender Fee 0
EMD 10800
Tender Value
Place Office of the Executive Officer, Burdwan-II P.S.
Link
View Original Tender Notice

https://wbtenders.gov.in

Start Date November 15, 2023 14:30
End Date
Expired 25/11/2023

Expired 936 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of bir raghab moran and others (8 nos) statues and memorial park at gelapukhuri, tinsukia (phase ii) (rsl 22)

Construction of bir raghab moran and others (8 nos) statues and memorial park at gelapukhuri, tinsukia (phase ii) (rsl 22)

Read more
Sitc of 1 nos 2.0 tr 5 star inverter split ac units and allied electrical works for chamber of ddpo(delivery) at gpo kolkata.

Sitc of 1 nos 2.0 tr 5 star inverter split ac units and allied electrical works for chamber of ddpo(delivery) at gpo kolkata.

Read more
Investigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar panchayat amethi distt lucknow up india

Investigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co &amp#x0d treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar &amp#x0d panchayat amethi distt lucknow up india

Read more
Construction of civil foundation 2 nos. 33 kv feeder bay for m/s prinjal renewable energy along with ext. of control room building at 132 kv gss momasar

Construction of civil foundation 2 nos. 33 kv feeder bay for m/s prinjal renewable energy along with ext. of control room building at 132 kv gss momasar

Read more
05/ee(e)(puducherry)/cpwd/2026-27 - recall 2

Construction of 400 bedded boys hostel building at jipmer campus, puducherry. (civil work): building portion including internal water supply lines, sanitary installation, drainage, demolition of existing quarters and other development works. (electrical and mechanical installation): package c1: providing internal ei, c2: providing fire alarm system, c3: providing firefighting system, c4: providing cctv, c5: providing 3 nos. 13 passenger lift, c6: providing 5000 lpd solar water heater, c7: providing network, (agreement no.32/ee(puducherry)/cpwd/2023-24) sub head: risk and cost under clause 14 for providing 2nos. 13 passenger lift.

Read more
Design supply construction testing and commissioning of 3 nos 11kv and 2 nos 33kv overhead transmission line to ug cable at various locations for rly track crossing in sbhr padil rly sectn of swr

Design supply construction testing and commissioning of 3 nos 11kv and 2 nos 33kv overhead transmission line to ug cable at various locations for rly track crossing in sbhr padil rly sectn of swr

Read more
Construction of cremation shed at ghordanga village under narayanpur g.p. under the fund from dmf for the year 2025-26

Construction of cremation shed at ghordanga village under narayanpur g.p. under the fund from dmf for the year 2025-26

Read more
Construction of community shed fabricated at jagti near jagdamba mandir, ward no.2, pyt. jagti, block nagrota under scheme mplads for the year 2025 26 2nd call

Construction of community shed fabricated at jagti near jagdamba mandir, ward no.2, pyt. jagti, block nagrota under scheme mplads for the year 2025 26 2nd call &amp#x0d

Read more
Construction of balance bop elementats at 142 nos non-composite bops where land is more than 03 acres 02nd phase sh - consultancy services for complete soil investigation for 4 nos bops namely bop thakupur and adhiyan of 58 bn now 135 bn bop kass

Construction of balance bop elementats at 142 nos non-composite bops where land is more than 03 acres 02nd phase sh - consultancy services for complete soil investigation for 4 nos bops namely bop thakupur and adhiyan of 58 bn now 135 bn bop kass

Read more

Construction of the laboratory building for central power research institute at naya raipur loc village-banjari, layer-2, naya raipur (c.g.) (s.h.:- c/o temperature rise test bay, impulse test bay, routine t energy meter testing cyber security building, electric sub-station, deep tube well (2 nos.) recharge pit 1 no. underground sump of capacity 50,000 liters with pump house, internal road with rcc drain including service and horticulture operation etc. s.h.- providing pump set.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise