Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Irqp Work Of Nawagarh Topchanchi Road (Length 19.50 Km) Total Length 19.50 Km (Carriage Way 7.00m) Under Plan Head For The Year 2023 24
|
| Description |
Irqp Work Of Nawagarh Topchanchi Road (Length 19.50 Km) Total Length 19.50 Km (Carriage Way 7.00m) Under Plan Head For The Year 2023 24
|
| Organisation | Government of Jharkhand |
| Tender Id | 2023_CECOM_78869_1 |
|
Reference Number |
RCD/Dhanbad/1873/2023-24 (1ST Call) |
| Tender Fee | 10000 |
| EMD | 20.44 Lakh |
| Tender Value | - |
| Place | The Chairman, e-Procurement Cell,RCD Dhurwa Ranchi |
| Link |
View Original Tender Notice
https://jharkhandtenders.gov.in |
| Start Date | December 13, 2023 20:30 |
| End Date |
Expired
03/01/2024
Expired 1018 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Irqp and strengthening work of asura pwd road to kumardungi via balandia road from km 0.00 to km 38.65 (total length 38.65 km) under road division chaibasa for the year 2026-27
Irqp and strengthening work of asura pwd road to kumardungi via balandia road from km 0.00 to km 38.65 (total length 38.65 km) under road division chaibasa for the year 2026-27
Read moreAnnual clearance of road berm upto premix top level, removing of un-wanted excavated earth/ wet silt from berm and side drains, deep drains having road length of different carriage way 11km. cleaning of premises around estate civil electrical win
Annual clearance of road berm upto premix top level, removing of unwanted excavated earth wet silt from berm and side drains deep drains having road length of different carriage way 11km cleaning of premises around estate civilelect wi
Read moreReducing nipple of size 1/2 x 3/8 bsp threading (parallel) on both sides, total length - 40mm; 1/2 threaded length -15 mm; 3/8 threaded length-15mm, hex. head thickness-10mm, width af27mm, 3/8 ends inside should have tapered profile (cone type). material: carbon steel astm-a108 & grade a1018 with zinc coated. note: material should be machined from forged planks & not to be casted.
Reducing nipple of size 1/2 x 3/8 bsp threading (parallel) on both sides, total length - 40mm; 1/2 threaded length -15 mm; 3/8 threaded length-15mm, hex. head thickness-10mm, width af27mm, 3/8 ends inside should have tapered profile (cone type). material: carbon steel astm-a108 & grade a1018 with zinc coated. note: material should be machined from forged planks & not to be casted.
Read moreDesign, supply, erection, testing & commissioning of 2x25 kv, 50 hz, traction over-head equipment, traction substations, switching stations, scada, general electrical services works along with ohe works in 5 nos of tunnels (total length:7.5 kms), civil engineering works and other associated works between section digras (excl.) - nanded (excl.) 128 rkm /146 tkm of nagpur division in central railway, maharashtra, india
Design, supply, erection, testing & commissioning of 2x25 kv, 50 hz, traction over-head equipment, traction substations, switching stations, scada, general electrical services works along with ohe works in 5 nos of tunnels (total length:7.5 kms), civil engineering works and other associated works between section digras (excl.) - nanded (excl.) 128 rkm /146 tkm of nagpur division in central railway, maharashtra, india
Read moreIrqp work of chirkunda panchet road (length 7.20 km) and nehru link road (length 1.80 km) total length 9.00 km (carriage way 7.00m) under plan head for the year 2023-24
Irqp work of chirkunda panchet road (length 7.20 km) and nehru link road (length 1.80 km) total length 9.00 km (carriage way 7.00m) under plan head for the year 2023-24
Read moreIrqp work of chirkunda panchet road (length 7.20 km) and nehru link road (length 1.80 km) total length 9.00 km (carriage way-7.00m) under plan head for the year 2023-24
Irqp work of chirkunda panchet road (length 7.20 km) and nehru link road (length 1.80 km) total length 9.00 km (carriage way-7.00m) under plan head for the year 2023-24
Read moreIrqp work in km 32.10 to 47.55 of adardih-milan chowk road (carriage way 5.50m) (total length-15.450 km) for the year 2024-25
Irqp work in km 32.10 to 47.55 of adardih-milan chowk road (carriage way 5.50m) (total length-15.450 km) for the year 2024-25
Read moreIrqp of chakradharpur-toklo-kuchai road total length (22.17 k.m.)
Irqp of chakradharpur-toklo-kuchai road total length (22.17 k.m.)
Read moreStrengthening irqp work of hussainabad pathraghat road total length- 29.10 km
Strengthening irqp work of hussainabad pathraghat road total length- 29.10 km
Read moreIrqp work of chiyanki rajwadih bypass total length 6.00 km road
Irqp work of chiyanki rajwadih bypass total length 6.00 km road for the year 2023-24
Read moreof your Industry type