Tender Details
Particulars | Details |
---|---|
Title |
Pare Of Common Relief Valve Of Jacking Oil System Of Unit# 7 To# 10
|
Description |
|
Organisation | Materials | Ministry of Mines |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | April 11, 2025 16:09 |
End Date |
02/05/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tender for road transportation of black oil (fo/ldo/premium lshs) by top loading tank lorries from bpcl kochi terminals, kerala to various locations (direct customers, etc.) within state and outside state.
Tender for road transportation of black oil (fo/ldo/premium lshs) by top loading tank lorries from bpcl kochi terminals, kerala to various locations (direct customers, etc.) within state and outside state.
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSs of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Ss of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read moreCon from single deck to double deck floating roof and revamping of three crude oil tanks t601a, t202c, t202d of nominal capacity of 60.000 m3, uran plant
Con from single deck to double deck floating roof and revamping of three crude oil tanks t601a, t202c, t202d of nominal capacity of 60.000 m3, uran plant
Read moreSupply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.
Supply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.
Read moreExpression of interest for selection of system operator to implement deposit refund scheme in the state of goa
Expression of interest for selection of system operator to implement deposit refund scheme in the state of goa
Read moreCustom bid for services - installation of one manual gantry for cooling towers of unit# 7 or 8, ctp
Read more
Plc of 200 mm crmb 60 mm dbm and 40 mm bc incl cleaning of road surface and applying pc comma tc and rd marking for surf wks bet km 0 to km 7 net length 7 km on pt 4840 high ground bl rd under 108 rcc 759 brtf of project deepak in hp
Plc of 200 mm crmb 60 mm dbm and 40 mm bc incl cleaning of road surface and applying pc comma tc and rd marking for surf wks bet km 0 to km 7 net length 7 km on pt 4840 high ground bl rd under 108 rcc 759 brtf of project deepak in hp
Read moreConst of drainage system from campus to existing canal of state govt bihar near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Const of drainage system from campus to existing canal of state govt bihar , near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Read moreof your Industry type