Tender Details
Particulars | Details |
---|---|
Title |
Widening Of R. O.B. At Ch. 57/200 On Arvi Wardha Waigaon Ralegaon Road Sh.267 In Wardha District Wardha.( B.T. Work Only)
|
Description |
Widening Of R. O.B. At Ch. 57/200 On Arvi Wardha Waigaon Ralegaon Road Sh.267 In Wardha District Wardha.( B.T. Work Only)
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2025_PWR_1176054_1 |
Reference Number |
2526TN0401Open |
Tender Fee | 1090 |
EMD | 45000 |
Tender Value | |
Place | Wardha |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2042692 |
Start Date | May 01, 2025 14:30 |
End Date |
08/05/2025 ( Expired 5 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreWbpwd(r)/se/chc/nib-01/25-26/1 / collection of toll on shree gouranga setu over river bhagirathi at nabadwip in the district of nadia under nadia highway division no. i.
Collection of toll on shree gouranga setu over river bhagirathi at nabadwip in the district of nadia under nadia highway division no. i.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreC/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
Read moreWbpwd/pw(r)/sepd/piu-i/nit-06 of 2025-2026,sl-1
Dhulagarh -jujursah- ekabbarpur road, from 0.00 kmp to 9.00 kmp, widening and strengthening work under howrah highway division in the district of howrah under ridf -xxx.(2nd call)
Read moreAAAAAAAAAA
Login to viewNirol - khatundidanga road from 0.00 kmp to 3.200 kmp odr, widening and strengthening work under burdwan north highway division in the district of purba bardhaman.
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreConstruction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a / 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj
Construction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a /&#x0d 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj.
Read moreSupply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Supply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Read moreof your Industry type