Tender Details
About Tender
🏗️ Invitation For Project Management Consultants 🛣️ The Mumbai Metropolitan Region Development Authority (Mmrda), A State Government Entity, Is Seeking The Appointment Of Project Management Consultants (Pmc) For The Design And Construction Of The Balkum To Gaimukh Nh 3 Connector, Including The Ghodbunder By Pass (Dp Road), Thane Coastal Road. 📅 Bid Submission Deadline: April 30, 2024, 5:30 Pm 💸 Tender Fee: Inr 10,000 Earnest Money Deposit (Emd): Inr 26,00,000 Interested Consultants Must Possess The Requisite Expertise In Infrastructure Development, Particularly In Road Projects. Detailed Proposals, Including Technical Capabilities And Financial Bids, Are To Be Submitted By The Stipulated Deadline. Keywords: Project Management Consultants, Infrastructure Development, Road Project, Mumbai Metropolitan Region Development Authority, Thane Coastal Road, Tender, Bid Submission, EmdParticulars | Details |
---|---|
Title |
Appointment Of Project Management Consultants For The Work Of Design And Construction Of Balkum To Gaimukh Nh 3 Connector Ghodbunder By Pass Dp Raod Thane Coastal Road
|
Description |
Appointment Of Project Management Consultants For The Work Of Design And Construction Of Balkum To Gaimukh Nh 3 Connector Ghodbunder By Pass Dp Raod Thane Coastal Road
|
Organisation | Mumbai Metropolitan Region Development Authority | State Govt. and UT |
Tender Id | 2024_MMRDA_1036175_1 |
Reference Number |
ED/PMC/Balkum to gaimukh/2024 |
Tender Fee | 10000 |
EMD | 26 Lakh |
Tender Value | |
Place | THANE |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1811698 |
Start Date | March 21, 2024 20:30 |
End Date |
04/07/2024 ( Expired 341 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Appointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreConsultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 koloriang to sarli km 168.0 to 183.40 15.40 km and sarli to huri km 0.00 to 78.38 78.38km
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 koloriang to sarli km 168.0 to 183.40 15.40 km and sarli to huri km 0.00 to 78.38 78.38km
Read moreDesign and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Read moreConstruction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreDesign and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Read moreDesign and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreof your Industry type