Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cleaning Of Jungle Clearance And Earth Work Of Toe Drain At Rd 1570 M To 1690 M Of Flank Rajghat Dam And Spresding Levelling Of Dump Material Of Left Flank Of Earthen Dam
|
| Description |
Cleaning Of Jungle Clearance And Earth Work Of Toe Drain At Rd 1570 M To 1690 M Of Flank Rajghat Dam And Spresding Levelling Of Dump Material Of Left Flank Of Earthen Dam
|
| Organisation | Betwa River Board | Central Govt. Ministry/Department |
| Tender Id | 2025_BRD_789449_1 |
|
Reference Number |
198 Date 17-02-2025 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Rajghat |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1093837 |
| Start Date | February 18, 2025 22:30 |
| End Date |
Expired
21/02/2025
Expired 563 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cleaning of jungle clearance and earth work toe drain at rd 765 m to 865 m to left flank of earthen dam
Cleaning of jungle clearance and earth work toe drain at rd 765 m to 865 m to left flank of earthen dam
Read moreMaintenance and repair work of approach road at right flank of hatnur dam maintenance and repair work of earthen dam top road at right flank of hatnur dam removing silt and repairs to pitching toe drain and cross drain on right flank dewatering of r
Maintenance and repair work of approach road at right flank of hatnur dam maintenance and repair work of earthen dam top road at right flank of hatnur dam removing silt and repairs to pitching toe drain and cross drain on right flank dewatering of r
Read moreCleaning of left and right flank earthen dam and maintenance and repair to pitching of waghur dam maintenance and repairing with colouring left side non over flow section parapet wall of waghur dam m and r to both flank approach road side gutter
Cleaning of left and right flank earthen dam and maintenance and repair to pitching of waghur dam maintenance and repairing with colouring left side non over flow section parapet wall of waghur dam m and r to both flank approach road side gutter
Read moreCleaning of jungle clearance rd 370 m to 1500 m view point upto right side earth dam rajghat between toe drain to service road clearance
Cleaning of jungle clearance rd 370 m to 1500 m view point upto right side earth dam rajghat between toe drain to service road clearance
Read moreGeneral-mp - dam safety -urgent rectification works to the toe drain on the down stream end of earthen dam of malampuzha dam-general civil work
The estimate is prepared for urgent rectification&#x0d works in toe drain on the downstream of&#x0d earthen dam of mal dam. the toe&#x0d drain is unlined and seepage measurements are&#x0d inaccurate since the water percolates through&#x0d the gaps of rubble masonry. s
Read moreM and r earthen dam envolope side of stair case concrete work of waghur dam
M and r earthen dam envolope side of stair case concrete work of waghur dam
Read moreGeneral-chimoni dam- dso works 2024-25-rectification works to the toe drain of earthen dam- balance work-general civil work e
General-chimoni dam- dso works 2024-25-rectification works to the toe drain of earthen dam- balance work-general civil work
Read moreCleaning of hscl out fall drain nala from 0 m to 611 m at rajghat dam
Cleaning of hscl out fall drain nala from 0 m to 611 m at rajghat dam
Read moreThe disturbed upstream side riprap of the earthen bund and filling the gap in right and left flank of the kadamparai dam
The disturbed upstream side riprap of the earthen bund and filling the gap in right and left flank of the kadamparai dam
Read moreof your Industry type