Tender Details

Particulars Details
Title
The Disturbed Upstream Side Riprap Of The Earthen Bund And Filling The Gap In Right And Left Flank Of The Kadamparai Dam
Description
The Disturbed Upstream Side Riprap Of The Earthen Bund And Filling The Gap In Right And Left Flank Of The Kadamparai Dam
Organisation Government of Tamil Nadu
Tender Id 2023_EB_392964_1
Reference
Number
SE/KGC/MIN/TS/CIVIL/07/23-24
Tender Fee 0
EMD 21410
Tender Value -
Place Attakatty
Link
View Original Tender Notice

https://tntenders.gov.in

Start Date November 25, 2023 22:30
End Date
Expired 13/12/2023

Expired 990 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Reconstruction of riprap in upstream face of manimuthar dam in ambasamudram taluk of tirunelveli district.

Reconstruction of riprap in upstream face of manimuthar dam in ambasamudram taluk of tirunelveli district.

Read more
Repair of disturbed and settled upstream side dam pitching of waghadi medium project.

Repair of disturbed and settled upstream side dam pitching of waghadi medium project.

Read more
Clearing the heavy jungle from upper aliyar dam to kadamparai dam

Clearing the heavy jungle from upper aliyar dam to kadamparai dam

Read more
Arresting water leakage in spillway gate pier no1 and abutment of kadamparai dam using polyurethane grout as recommended by the dam rehabilitation and improvement wing of tngecl kadamparai dam

Arresting water leakage in spillway gate pier no1 and abutment of kadamparai dam using polyurethane grout as recommended by the dam rehabilitation and improvement wing of tngecl kadamparai dam

Read more
Maintenance and repair work of approach road at right flank of hatnur dam maintenance and repair work of earthen dam top road at right flank of hatnur dam removing silt and repairs to pitching toe drain and cross drain on right flank dewatering of r

Maintenance and repair work of approach road at right flank of hatnur dam maintenance and repair work of earthen dam top road at right flank of hatnur dam removing silt and repairs to pitching toe drain and cross drain on right flank dewatering of r

Read more
Rooting out and removal of vegetation on upstream slope and downstream slope of tenughat dam . (for 3 years), rearranging disturbed rip rap and depressed patches., closing down the gap in u/s parapet wall and providing continuous parapet wall

Rooting out and removal of vegetation on upstream slope and downstream slope of tenughat dam . (for 3 years), rearranging disturbed rip rap and depressed patches., closing down the gap in u/s parapet wall and providing continuous parapet wall

Read more
Rooting out and removal of vegetation on upstream slope and downstream slope of tenughat dam. (for 3 years), rearranging disturbed rip rap and depressed patches., closing down the gap in us parapet wall and providing continuous parapet wall and

Rooting out and removal of vegetation on upstream slope and downstream slope of tenughat dam. (for 3 years), rearranging disturbed rip rap and depressed patches., closing down the gap in us parapet wall and providing continuous parapet wall and

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise