Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of Final Drive Shaft Housing ( 04 No), Repair / Fitment Of Bushes Of The Same And Fitment Of Bushes Final Drive Shaft In S10 Shovel At Ashok Ocp At Piparwar Area
|
| Description |
Repairing Of Final Drive Shaft Housing ( 04 No), Repair / Fitment Of Bushes Of The Same And Fitment Of Bushes Final Drive Shaft In S10 Shovel At Ashok Ocp At Piparwar Area
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_281533_1 |
|
Reference Number |
PE(X)/AOCP/NIT/23-24/13 |
| Tender Fee | - |
| EMD | 4100 |
| Tender Value | - |
| Place | OFFICE OF PO ASHOK |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | June 15, 2023 22:30 |
| End Date |
Expired
27/06/2023
Expired 1210 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of undercarriage repair of hand railing, etc of s15 shovel, dismantling repairing and back fitment of drive shaft, turbo pipe etc of dumper t74 and dismantling repairing straightening and back fitment of hand railing, etc dumper t77 aocp
Replacement of undercarriage repair of hand railing, etc of s15 shovel, dismantling repairing and back fitment of drive shaft, turbo pipe etc of dumper t74 and dismantling repairing straightening and back fitment of hand railing, etc dumper t77 aocp
Read moreRepairing of final drive, tilt cylinder ,eye arm pin along with fitment of floating seal in bd355 dozer sl.no 12002 working at samleswari ocp
Repairing of final drive, tilt cylinder ,eye arm pin along with fitment of floating seal in bd355 dozer sl.no 12002 working at samleswari ocp
Read moreRepairing of stick cylinder, cracked boom, final drive housing, replacement of track shoe, both side track tensioner and cabin safety grill for ck 300 shovel si. no. bo 738 of birsa ocp..
Repairing of stick cylinder, cracked boom, final drive housing, replacement of track shoe, both side track tensioner and cabin safety grill for ck 300 shovel si. no. bo 738 of birsa ocp..
Read moreRepairing of boom foundation eyes (both side) and boom- stick eyes, repairing of upper turret structure cowling case, counter weight foundation, bucket eye holes, babc and connecting rod with fitment of bushes in ck300 shovel sl.no. 759 of religara c
Repairing of boom foundation eyes (both side) and boom- stick eyes, repairing of upper turret structure cowling case, counter weight foundation, bucket eye holes, babc and connecting rod with fitment of bushes in ck300 shovel sl.no. 759 of religara c
Read moreRepairing of guide roller along with its foundations, repairing of coupling of crowd, hoist generator, propel motor and hoist motor, repairing of final drive and repairing of take up axle along with repairing of steel sleeves and fitment in ekg 593
Repairing of guide roller along with its foundations, repairing of coupling of crowd, hoist generator, propel motor and hoist motor, repairing of final drive and repairing of take up axle along with repairing of steel sleeves and fitment in ekg 593
Read moreComplete denting and painting of lnt ck300 shovel s7 and ekg 5a shovel s10 at ashok ocp at piparwar area.
Complete denting and painting of lnt ck300 shovel s7 and ekg 5a shovel s10 at ashok ocp at piparwar area.
Read moreRepairing of final drive assy, d155 dozer sl .no. d21 at ashok ocp, piparwar area.
Repairing of final drive assy, d155 dozer sl .no. d21 at ashok ocp, piparwar area.
Read moreRepairing of lh rh engagement coupling hoist brake assly and liner fitting of s10 shovel at ashok ocp, piparwar area.
Repairing of lh rh engagement coupling hoist brake assly and liner fitting of s10 shovel at ashok ocp, piparwar area.
Read moreRemoval repair fitment of bearing axle and fitment of bush. fabrication new ladder assembly, main motor coupling and base 04 nos., collector ring mounting final drive inspection plate and 04 nos. idler wheel housing of s10 shovel at ashok ocp.
Removal repair fitment of bearing axle and fitment of bush. fabrication new ladder assembly, main motor coupling and base 04 nos., collector ring mounting final drive inspection plate and 04 nos. idler wheel housing of s10 shovel at ashok ocp.
Read moreRepairing and line boring of housing of the intermediate shaft drive shaft of final drive and fitment of bushing to the repaired housing of the final drive lh and rh side of hmb-519 shovel at antst-jg ocp, lodna area, bccl.
1. heating of the housing of the final drive for burning the oil and grease before welding of the worn
 out potion for the boring.
 2. welding of the worn out housing of the busing part no-1004-19-57
Read moreof your Industry type