Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Box Tunnel On Pile Foundation With Touch Piles On Both Sides Between Ch 39457 39492 And Box Tunnel (Open Foundation Between Ch 39492 39620 As Slop Protection Measure In Connection With Dimapur(dhansari) Kohima(zubza) New Bg Railway Line Project.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78639329 |
|
Reference Number |
CE-CON-DK-PW-SLT-2024-07 |
| Tender Fee | 0 |
| EMD | 15.3 Lakh |
| Tender Value | - |
| Place | Guwahati |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78639329/viewNitPdf_4784032.pdf |
| Start Date | November 25, 2024 23:56 |
| End Date |
Expired
11/12/2024
Expired 632 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of box tunnel and u- through on pile foundation including slope protection measures by providing touch piles on hill and valley side between ch 39.302 km to 39.457 km in connection with dimapur(dhansiri)- kohima(zubza) new bg railway line project.
For complete deion and other details, please refer to tender
Read moreSlope protection work at t-10 p1 between station piphema-zubza in connection with dimapur-kohima new bg railway line project.
For complete deion and other details, please refer to tender
Read moreEarth work in filing & cutting at pherima yard from chainage 43.280 km to 43.750 km including protection works in connection with dimapur(dhansari)- kohima(zubza) new bg railway line project.
For complete deion and other details, please refer to tender
Read moreEarthwork in formation/ cutting including slope protection and construction of minor bridge no-163 at pherima yard in between ch:-44.00km to ch:44.500 km in connection with dimapur (dhansiri)-kohima (zubza) new bg railway line project.
For complete deion and other details, please refer to tender
Read moreJeypore- malkangiri new b.g railway line : geotechnical investigation, geological mapping and desk study of the tunnel alignment etc. between tanginiguda station to govindapalli station i.e., tunnel-1 from ch. 41592m to 42052m, tunnel-2 from ch.42870m to 43620m, tunnel-3 from ch.44181m to 44771m, tunnel-4 from ch.45460m to 45560m, tunnel-5 from ch.50177m to 53177m, tunnel-6 from ch.57503m to 59253m, tunnel-7 from ch.60778m to 61308m, tunnel-8 from ch.61529m to 61709m, tunnel-9 from ch.61919
For complete deion and other details, please refer to tender
Read moreProtection of slope in high cutting and construction of gabbion wall with backfill and structural fill behind the wall at piphema yard in between ch:-59.440km to ch:- 60.700km in connection with dimapur (dhansiri)-kohima (zubza) new bg railway line project.
For complete deion and other details, please refer to tender
Read moreSelection of general consultant for twin tube road tunnel ch 0.00 to ch 11.84 km between
Selection of general consultant for twin tube road tunnel ch 0.00 to ch 11.84 km between thane to borivali
Read moreBalance work of construction of single line bg tunnel no. 9 (length-600m), tunnel no. 11 (length-350m), tunnel no. 13 (length-400.0 m) & tunnel no. 16 (length- 600.0 m) including cut & cover, earthwork in bank & cutting to make formation and other protection and ancillary works between piphema-zubza section in connection with dimapur - kohima new bg line project.
For complete deion and other details, please refer to tender
Read moreConstruction of cast-in-situ box tunnel in rock falling location in between ch. 7.660 km to ch. 7.890 km from hansdiha and making suitable di line in connection with new bg line between hansdiha and godda.
For complete deion and other details, please refer to tender
Read moreDetailed design, 3d monitoring, geotechnical investigation and construction supervision of construction of single line bg tunnel no.1 between ch: 7540 to ch: 11640, (approximate total length 4100 m) including escape tunnel (approximate total length 4100 m) between badiya (ch: 4100 m) - beka (ch: 14750 m) stations of dr. ambedkar nagar (mhow) - sanawad section in connection with ratlam-mhow-khandwa gauge con project of western railway
For complete deion and other details, please refer to tender
Read moreof your Industry type