Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Slope Protection Work And Other Ancillary Work Etc. At Piphema Yard In Between Ch 59.400 Km To Ch 60.700 Km In Connection With Dimapur (Dhansiri) Kohima (Zubza) New Bg Railway Line Project.
|
| Description |
Slope Protection Work And Other Ancillary Work Etc. At Piphema Yard In Between Ch 59.400 Km To Ch 60.700 Km In Connection With Dimapur (Dhansiri) Kohima (Zubza) New Bg Railway Line Project.
|
| Organisation | Ministry of Railways |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | October 08, 2026 00:25 |
| End Date |
Open
11/11/2026
27 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Manufacturing and supplying of 50 mm size of pakur variety hard machine crushed stone ballast of approved quality from quarry pakur/ talijhari/ bakudi/ sahibganj/ pinergaria for the section from molvom (mlvm) yard to pherima (perm) yard and upto km 44/5 of dimapur (dhansiri) - kohima (zubza) bg new line project of n.f. railway construction organization.
Manufacturing and supplying of 50 mm size of pakur variety hard machine crushed stone ballast of approved quality from quarry pakur/ talijhari/ bakudi/ sahibganj/ pinergaria for the section from molvom (mlvm) yard to pherima (perm) yard and upto km 44/5 of dimapur (dhansiri) - kohima (zubza) bg new line project of n.f. railway construction organization.
Read moreSlope protection work at t-10 p1 between station piphema-zubza in connection with dimapur-kohima new bg railway line project.
For complete deion and other details, please refer to tender
Read moreProtection of slope in high cutting and construction of gabbion wall with backfill and structural fill behind the wall at piphema yard in between ch:-59.440km to ch:- 60.700km in connection with dimapur (dhansiri)-kohima (zubza) new bg railway line project.
For complete deion and other details, please refer to tender
Read moreEarthwork in formation/ cutting including slope protection and construction of minor bridge no-163 at pherima yard in between ch:-44.00km to ch:44.500 km in connection with dimapur (dhansiri)-kohima (zubza) new bg railway line project.
For complete deion and other details, please refer to tender
Read moreConstruction of box tunnel and u- through on pile foundation including slope protection measures by providing touch piles on hill and valley side between ch 39.302 km to 39.457 km in connection with dimapur(dhansiri)- kohima(zubza) new bg railway line project.
For complete deion and other details, please refer to tender
Read moreStmc for restoration of hill slope from km ch. 161.120 to km ch. 161.220 at 4-laning of dimapur-kohima
Short term maintenance contract for restoration of hill slope from km ch. 161.120 to km ch. 161.220 at 4-laning of dimapur-kohima section (nh-29) in the state of nagaland in fy 2025-26 percentage rate and work order basis
Read moreConducting slope stability analysis along with aerial survey, geological investigation, providing design for slope stability, submission of scheme for remedial measures and expert supervision during execution at landslide locations from shokhuvi to pherima in connection with dimapur (dhansiri) kohima (zubza) new bg line project.
For complete deion and other details, please refer to tender
Read moreConducting slope stability analysis along with aerial survey, geological investigation, providing design for slope stability, submission of scheme for remedial measures and expert supervision during execution at landslide locations from shokhuvi to pherima in connection with dimapur (dhansiri) kohima (zubza) new bg line project.
For complete deion and other details, please refer to tender
Read moreStmc hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29
Short term maintenance contract for hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29 in the state of nagaland in fy 2025-26 percentage rate and work order basis
Read moreConstruction of box tunnel on pile foundation with touch piles on both sides between ch 39457 - 39492 and box tunnel (open foundation between ch 39492 - 39620 as slop protection measure in connection with dimapur(dhansari)- kohima(zubza) new bg railway line project.
For complete deion and other details, please refer to tender
Read moreof your Industry type