Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Conducting Slope Stability Analysis Along With Aerial Survey, Geological Investigation, Providing Design For Slope Stability, Submission Of Scheme For Remedial Measures And Expert Supervision During Execution At Landslide Locations From Shokhuvi To Pherima In Connection With Dimapur (Dhansiri) Kohima (Zubza) New Bg Line Project.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78095828 |
|
Reference Number |
CE-CON-DK-MIS-ST-2024-04 |
| Tender Fee | 0 |
| EMD | 2.07 Lakh |
| Tender Value | - |
| Place | Guwahati |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/102024/78095828/viewNitPdf_4751860.pdf |
| Start Date | October 24, 2024 00:23 |
| End Date |
Expired
30/10/2024
Expired 668 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Conducting slope stability analysis along with aerial survey, geological investigation, providing design for slope stability, submission of scheme for remedial measures and expert supervision during execution at landslide locations from shokhuvi to pherima in connection with dimapur (dhansiri) kohima (zubza) new bg line project.
For complete deion and other details, please refer to tender
Read moreEarthwork in formation/ cutting including slope protection and construction of minor bridge no-163 at pherima yard in between ch:-44.00km to ch:44.500 km in connection with dimapur (dhansiri)-kohima (zubza) new bg railway line project.
For complete deion and other details, please refer to tender
Read moreSlope protection work at t-10 p1 between station piphema-zubza in connection with dimapur-kohima new bg railway line project.
For complete deion and other details, please refer to tender
Read moreEarth work in filing & cutting at pherima yard from chainage 43.280 km to 43.750 km including protection works in connection with dimapur(dhansari)- kohima(zubza) new bg railway line project.
For complete deion and other details, please refer to tender
Read moreProtection of slope in high cutting and construction of gabbion wall with backfill and structural fill behind the wall at piphema yard in between ch:-59.440km to ch:- 60.700km in connection with dimapur (dhansiri)-kohima (zubza) new bg railway line project.
For complete deion and other details, please refer to tender
Read moreEmpanelment of firms for conducting engineering geological investigation, geophysical investigation, geotechnical investigation and slope stability assessment in uttarakhand state
Empanelment of firms for conducting engineering geological investigation, geophysical investigation, geotechnical investigation and slope stability assessment in uttarakhand state
Read moreConstruction of box tunnel and u- through on pile foundation including slope protection measures by providing touch piles on hill and valley side between ch 39.302 km to 39.457 km in connection with dimapur(dhansiri)- kohima(zubza) new bg railway line project.
For complete deion and other details, please refer to tender
Read moreHiring of consultancy firm for conducting topographic survey geological investigation geotechnical investigation geo-physical investigation and slope stability analysis in nainital city uttarakhand
Hiring of consultancy firm for conducting topographic survey geological investigation geotechnical investigation geo-physical investigation and slope stability analysis in nainital city uttarakhand
Read moreHiring of consultancy firm for conducting topographic survey geological investigation geotechnical investigation geo-physical investigation and slope stability analysis in nainital city uttarakhand
Hiring of consultancy firm for conducting topographic survey geological investigation geotechnical investigation geo-physical investigation and slope stability analysis in nainital city uttarakhand
Read moreSlope stability erosion control landslide correction measures at various section on takoli kullu section of nh03 from km 262 to km 265 in hp on epc mode
Slope stability erosion control landslide correction measures at various section on takoli kullu section of nh03 from km 262 to km 265 in hp on epc mode
Read moreof your Industry type