Tender Details
Particulars | Details |
---|---|
Title |
Kmc/Ee(c)/Br Iv/38/21/24 25/R
|
Description |
Improvement Of Asphaltum Passage By Laying Cement Concrete From 5 No. Jadunath Sen Lane To 16 C/2, Shibnarayan Das Lane In Ward No. 038 Under Br Iv.
|
Organisation | KOLKATA MUNICIPAL CORPORATION | State Govt. and UT |
Tender Id | 2025_KMC_829605_1 |
Reference Number |
KMC/EE(C)/Br-IV/38/21/24-25/R |
Tender Fee | 0 |
EMD | 2650 |
Tender Value | |
Place | BOROUGH-IV |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1847397 |
Start Date | March 21, 2025 22:30 |
End Date |
02/04/2025 ( Expired 21 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.132.320 in dhamasiya village in naswade taluka to ch.161.000 in jitnagar village in nandod taluka (l 28.680 km) section of nh-56 in gujarat on ham (pkg-iv(a)
Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.132.320 in dhamasiya village in naswade taluka to ch.161.000 in jitnagar village in nandod taluka (l 28.680 km) section of nh-56 in gujarat on ham (pkg-iv(a)
Read moreUpgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.161.000 in jitnagar village in nandod taluka to ch.179.780 in bitada-movi village in netrang taluka (l 18.780 km) section of nh-56 in gujarat on ham (pkg-iv)(b)
Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.161.000 in jitnagar village in nandod taluka to ch.179.780 in bitada-movi village in netrang taluka (l 18.780 km) section of nh-56 in gujarat on ham (pkg-iv)(b)
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreConsultancy services for authority engineer for supervision of 2 lane paved shoulder / 4 laning of damoh jabalpur section of nh-34 in madhya pradesh from damoh (design ch.0.000km) to jabera (design ch.43.500) (pl 43.500 km) under nh(o) on epc mode
Consultancy services for authority engineer for supervision of 2 lane paved shoulder / 4 laning of damoh jabalpur section of nh-34 in madhya pradesh from damoh (design ch.0.000km) to jabera (design ch.43.500) (pl 43.500 km) under nh(o) on epc mode
Read moreAAAAAAAAAA
Login to viewConstruction of pcc road 1. from h/o. ujjal das to h/o. subodh das 2. from h/o. ratan debnath to h/o. joydeb banerjee 3. from h/o. babu acharjee to h/o. rekha brahma 4. from h/o. rekha brahma to h/o. avik biswas at ward no-4 under haringhata municip
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreConstruction of fob from mbpt gate no. 5 to siws school at wadala in f-north ward.
Construction of fob from mbpt gate no. 5 to siws school at wadala in f-north ward.
Read moreIe for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Read moreAddn altn dsc lines bldg no mt8, renovation of mns offrs bldg no p1, spl repair to flooring, wall paneling, false ceiling in offrs of med br, and in bldg no ii-1, provn of wall mounted fans at bldg no od-4, od-2, od-1 inside fw under ge (fw) kolkata
Addn altn dsc lines bldg no mt8, renovation of mns offrs bldg no p1, spl repair to flooring, wall paneling, false ceiling in offrs of med br, and in bldg no ii-1, provn of wall mounted fans at bldg no od-4, od-2, od-1 inside fw under ge (fw) kolkata
Read moreof your Industry type