Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Badigaon To Kamira From Ch 0/400 To 6/00 Km And 0/00 To 0/400 Km For The Year 2025 26
|
| Description |
Badigaon To Kamira From Ch 0/400 To 6/00 Km And 0/00 To 0/400 Km For The Year 2025 26
|
| Organisation | CE RW I | State Govt. and UT |
| Tender Id | 2025_CERWI_121278_2 |
|
Reference Number |
Online Tender06/EERW Division Boudh 2025-26 |
| Tender Fee | 10000 |
| EMD | 75630 |
| Tender Value | |
| Place | O/o SERWDivision Boudh |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=564408 |
| Start Date | November 15, 2025 15:30 |
| End Date |
Expired
25/11/2025
Expired 238 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreBadigaon to kamira from ch 0/400 to 6/00km and 0/00 to 0/400 km for the year 2025-26
Badigaon to kamira from ch 0/400 to 6/00km and 0/00 to 0/400 km for the year 2025-26
Read moreS/r to badigaon- kamira road for the year 2023-24
S/r to badigaon- kamira road for the year 2023-24
Read moreMaintenance and repair of (a) jharbandh to guthuguda road from ch. 0/00km to 5/00km, (b)iskinda to bilaspur road from ch. 0/00km to 5/00km, (c) jharbandh to laudidhara road from ch. 0/00km to 4/500km,(d)kurlupali to beheraduburi road from ch. 0/00km
Maintenance and repair of (a) jharbandh to guthuguda road from ch. 0/00km to 5/00km, (b)iskinda to bilaspur road from ch. 0/00km to 5/00km, (c) jharbandh to laudidhara road from ch. 0/00km to 4/500km,(d)kurlupali to beheraduburi road from ch. 0/00km
Read morePr of road from pecharthal laljuri road to shantinagar awc l 0 900 km during the year 2025 26 sh surface drain patch metalling carpeting seal coat and protection works from ch 0 00km to ch 0 90 km
Pr of road from pecharthal laljuri road to shantinagar awc l 0 900 km during the year 2025 26 sh surface drain patch metalling carpeting seal coat and protection works from ch 0 00km to ch 0 90 km
Read morePr of road from pecharthal laljuri road to shantinagar awc l 0 900 km during the year 2025 26 sh surface drain patch metalling carpeting seal coat and protection works from ch 0 00km to ch 0 90 km
Pr of road from pecharthal laljuri road to shantinagar awc l 0 900 km during the year 2025 26 sh surface drain patch metalling carpeting seal coat and protection works from ch 0 00km to ch 0 90 km
Read moreMaintenance and repair of (a) jamseth to jharbandh road from ch. 0/00km to 16/00km, (b)jamseth pwd road to nuapada border via chhindeikela (upto budhimal road) from ch. 0/00km to 10/00km (c) pr road to brahmantal road from ch. 0/00km to 4/484km
Maintenance and repair of (a) jamseth to jharbandh road from ch. 0/00km to 16/00km, (b)jamseth pwd road to nuapada border via chhindeikela (upto budhimal road) from ch. 0/00km to 10/00km (c) pr road to brahmantal road from ch. 0/00km to 4/484km
Read moreof your Industry type