Tender Details

Particulars Details
Title
Construction And Commissioning 4 Nos Tube Well With Pipe Line Under Juriction Of Nathdwara Division With Two Year Defect Liability District Rajsmand
Description
Construction And Commissioning 4 Nos Tube Well With Pipe Line Under Juriction Of Nathdwara Division With Two Year Defect Liability District Rajsmand
Organisation PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 1500
EMD 78420
Tender Value
Place Rajsamand
Link

AAAAAAAAAA

Login to view
Start Date June 30, 2025 23:30
End Date

12/07/2025 ( 9 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Sewer rehabilitation of old and deteriorated pipes by trenchless cipp technology for main trunk sewer lines heading towards nandari and salawas stps with three year defect liability period

Sewer rehabilitation of old and deteriorated pipes by trenchless cipp technology for main trunk sewer lines heading towards nandari and salawas stps with three year defect liability period

Read more
Strengthening of banur tepla road via surat manouli road (odr-42) in distt. sas nagar with 5 year maintenance (1 year defect liability period under head 5054 rb-10 roads)

Strengthening of banur tepla road via surat manouli road (odr-42) in distt. sas nagar with 5 year maintenance (1 year defect liability period under head 5054 rb-10 roads)

Read more
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Read more
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Read more
Construction of 2 nos. of 132 kv gss besroli and thanwala along with associated lines and bays under bn-9016002506

Construction of 2 nos. of 132 kv gss besroli and thanwala along with associated lines and bays under bn-9016002506

Read more
Construction of g.i. chain link fencing in government land parcels of abd area under smart city mission including defect liability period for one (01) year at satna, madhya pradesh

Construction of g.i. chain link fencing in &amp#x0d government land parcels of abd area under smart &amp#x0d city mission including defect liability period for one &amp#x0d (01) year at satna, madhya pradesh

Read more
Construction of two tube well boring, pumping plant, tube well room and electrification work for power in pocket-a of transport nagar scheme.

Construction of two tube well boring, pumping plant, tube well room and electrification work for power in pocket-a of transport nagar scheme.

Read more
Rejuvenation of sankat mochan lake with construction, installation and commissioning of 100 kld stp under amrut 2.0 scheme at chhatarpur

Rejuvenation of sankat mochan lake with construction, installation and commissioning of 100 kld stp under amrut 2.0 scheme at chhatarpur

Read more
Supply replacement testing commissioning of 5000 nos of t8 fluorescent tube lights with t8 led tube lights in the government buildings of lakshadweep islands and disposal of old tube lights

Supply replacement testing commissioning of 5000 nos of t8 fluorescent tube lights with t8 led tube lights in the government buildings of lakshadweep islands and disposal of old tube lights

Read more
Special repair of various link roads under repair programme 2022-23, 2023-24 and 2024-25 falling in market committee hoshiarpur assembly constituency urmar one year defect liability period plus 4 years maintenance of road group no. 1.

Special repair of various link roads under repair programme 2022-23, 2023-24 and 2024-25 falling in market committee hoshiarpur assembly constituency urmar one year defect liability period plus 4 years maintenance of road group no. 1.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise