Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction And Commissioning 4 Nos Tube Well With Pipe Line Under Juriction Of Nathdwara Division With Two Year Defect Liability District Rajsmand
|
Description |
Construction And Commissioning 4 Nos Tube Well With Pipe Line Under Juriction Of Nathdwara Division With Two Year Defect Liability District Rajsmand
|
Organisation | PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1500 |
EMD | 78420 |
Tender Value | |
Place | Rajsamand |
Link |
AAAAAAAAAA Login to view |
Start Date | June 30, 2025 23:30 |
End Date |
12/07/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sewer rehabilitation of old and deteriorated pipes by trenchless cipp technology for main trunk sewer lines heading towards nandari and salawas stps with three year defect liability period
Sewer rehabilitation of old and deteriorated pipes by trenchless cipp technology for main trunk sewer lines heading towards nandari and salawas stps with three year defect liability period
Read moreStrengthening of banur tepla road via surat manouli road (odr-42) in distt. sas nagar with 5 year maintenance (1 year defect liability period under head 5054 rb-10 roads)
Strengthening of banur tepla road via surat manouli road (odr-42) in distt. sas nagar with 5 year maintenance (1 year defect liability period under head 5054 rb-10 roads)
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreUpgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)
Read moreConstruction of 2 nos. of 132 kv gss besroli and thanwala along with associated lines and bays under bn-9016002506
Construction of 2 nos. of 132 kv gss besroli and thanwala along with associated lines and bays under bn-9016002506
Read moreConstruction of g.i. chain link fencing in government land parcels of abd area under smart city mission including defect liability period for one (01) year at satna, madhya pradesh
Construction of g.i. chain link fencing in &#x0d government land parcels of abd area under smart &#x0d city mission including defect liability period for one &#x0d (01) year at satna, madhya pradesh
Read moreConstruction of two tube well boring, pumping plant, tube well room and electrification work for power in pocket-a of transport nagar scheme.
Construction of two tube well boring, pumping plant, tube well room and electrification work for power in pocket-a of transport nagar scheme.
Read moreRejuvenation of sankat mochan lake with construction, installation and commissioning of 100 kld stp under amrut 2.0 scheme at chhatarpur
Rejuvenation of sankat mochan lake with construction, installation and commissioning of 100 kld stp under amrut 2.0 scheme at chhatarpur
Read moreSupply replacement testing commissioning of 5000 nos of t8 fluorescent tube lights with t8 led tube lights in the government buildings of lakshadweep islands and disposal of old tube lights
Supply replacement testing commissioning of 5000 nos of t8 fluorescent tube lights with t8 led tube lights in the government buildings of lakshadweep islands and disposal of old tube lights
Read moreSpecial repair of various link roads under repair programme 2022-23, 2023-24 and 2024-25 falling in market committee hoshiarpur assembly constituency urmar one year defect liability period plus 4 years maintenance of road group no. 1.
Special repair of various link roads under repair programme 2022-23, 2023-24 and 2024-25 falling in market committee hoshiarpur assembly constituency urmar one year defect liability period plus 4 years maintenance of road group no. 1.
Read moreof your Industry type