Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Toe Wall From Kaya Maya Park To Sports Ground At Mb Road Under Sub Division Ser 24 During 2023 24.
|
| Description |
Construction Of Toe Wall From Kaya Maya Park To Sports Ground At Mb Road Under Sub Division Ser 24 During 2023 24.
|
| Organisation | Government of NCT of Delhi |
| Tender Id | 2023_PWD_245594_1 |
|
Reference Number |
71/EE/SER-II/PWD/2023-24 |
| Tender Fee | 0 |
| EMD | 55974 |
| Tender Value | |
| Place | DIVN. SOUTH EAST ROAD-2, PWD |
| Link |
View Original Tender Notice
https://govtprocurement.delhi.gov.in |
| Start Date | August 04, 2023 20:50 |
| End Date |
Expired
11/08/2023
Expired 1058 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of toe wall, r...
Construction of toe wall, removing and re- fixing interlocking g.i. wire mesh on toe wall and providing and fixing of new interlocking g.i., wire mesh at missing places including etc and all other works contingent there to in front of sco - 85 to sco
Read moreConstruction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Read moreConstruction of cement concrete (cc) road on the damaged bituminous stretch of sachivalaya road near the djb filling station, under sub-division-3 of division c and nd-roads (m-413), new delhi, during 2026-27.
Construction of cement concrete (cc) road on the damaged bituminous stretch of sachivalaya road near the djb filling station, under sub-division-3 of division c and nd-roads (m-413), new delhi, during 2026-27.
Read moreA/r and m/o various roads under pwd division south west road-2/sub division-1,2,3,4 and 5 during 2026-27. (sh- emergency response arrangement for water logging through deployment of additional maintenance van and 127 hp pump during monsoon season).
A/r and m/o various roads under pwd division south west road-2/sub division-1,2,3,4 and 5 during 2026-27. (sh- emergency response arrangement for water logging through deployment of additional maintenance van and 127 hp pump during monsoon season).
Read moreRepair to drain compound wall footpath and certain misc extra services at nsb old mo v namac ctw ashoka park pallava park and wed under age br iii of ge nd visakhapatnam
Repair to drain compound wall footpath and certain misc extra services at nsb old mo v namac ctw ashoka park pallava park and wed under age br iii of ge nd visakhapatnam
Read moreConstruction of protection wall to the road nr. rakhandev temple at betkador assolda v.p. assolda
Construction of protection wall to the road nr. rakhandev temple at betkador assolda v.p. assolda
Read moreConstruction of bypass from jaitpura to jaisinghpura at sikar road
Construction of bypass from jaitpura to jaisinghpura at sikar road
Read moreCleaning of existing of roadside drains and chilchalling, kutcha drain cutting of road side flanks to facilitate proper drainage of surface water various location of the ghosh para road from 13.00 km to 25.60 km under bkp division during 26-27.sl 02
Read moreUnder district sultanpur, construction of cc road from dulhapur gram sabha to maharajganj road, lot no 7
Under district sultanpur, construction of cc road from dulhapur gram sabha to maharajganj road, lot no 7&#x0d
Read moreCleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Cleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Read moreof your Industry type