Tender Details

Particulars Details
Title
Sub Jail Mavelikkara, Replacement Of Damaged Exhaust Fan And Providing New Exhaust Fan In Jail Cell Blocks
Description
Sub Jail Mavelikkara, Replacement Of Damaged Exhaust Fan And Providing New Exhaust Fan In Jail Cell Blocks
Organisation Government of Kerala
Tender Id 2023_PWD_584192_1
Reference
Number
PWD/BLDG/TR/10705
Tender Fee 335
EMD 1029
Tender Value
Place Electrical Sub Division,Alappuzha
Link https://etenders.kerala.gov.in
Start Date June 26, 2023 15:30
End Date

04/07/2023 ( Expired 688 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat

Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat

Read more
Construction of 400 seater working women hostel

Construction of 400 seater working women hostel at new shillong township, mawdiangdiang, and 200 seater each working women hostel at jowai,byrnihat, tura in meghalaya

Read more
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana

Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana

Read more
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Read more
Independent engineer services during o and m stage of four laning of kaithal rajasthan border section of nh-65 (new nh-52-152) from km. 33.250 (design km. 0.500) to km. 241.580 (design km. 165.759) in the state of haryana under nhdp phase- iv through

Independent engineer services during o and m stage of four laning of kaithal rajasthan border section of nh-65 (new nh-52-152) from km. 33.250 (design km. 0.500) to km. 241.580 (design km. 165.759) in the state of haryana under nhdp phase- iv through

Read more
Supply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala

Supply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala

Read more
Widening of existing culvert and construction of new culvert on nh-09(old nh-125) from km- 121.700 to 129.450 (champawat aabadi portion), km 136.320 to km 142.00 (lohaghat aabadi portion), km 197.150 to km 202.00 (pithoragarh aabadi portion), in the

Widening of existing culvert and construction of new culvert on nh-09(old nh-125) from km- 121.700 to 129.450 (champawat aabadi portion), km 136.320 to km 142.00 (lohaghat aabadi portion), km 197.150 to km 202.00 (pithoragarh aabadi portion), in the

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise