Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Repair And Renovation Of Existing Road From Murda Hatt To Hawa Ghar To Sidrabong Hydel Project Total (1.70,4.70) 6.40 Km Length 1st 1.70 Km By Laying 25 Mm Thick Mastic Asphalt And Balance Portion 6 Thick Cement Concrete Over Existing Boulder Soling
|
Description |
Repair And Renovation Of Existing Road From Murda Hatt To Hawa Ghar To Sidrabong Hydel Project Total (1.70,4.70) 6.40 Km Length 1st 1.70 Km By Laying 25 Mm Thick Mastic Asphalt And Balance Portion 6 Thick Cement Concrete Over Existing Boulder Soling
|
Organisation | GORKHALAND TERRITORIAL ADMINISTRATION | State Govt. and UT |
Tender Id | 2024_GTA_788405_1 |
Reference Number |
GTA/P.S /EE/ DED(ES-I)/ NIeT- 77(1st Call)/e-Tender/2024-25 |
Tender Fee | 0 |
EMD | 10 Lakh |
Tender Value | |
Place | Darjeeling |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1747518 |
Start Date | December 23, 2024 23:30 |
End Date |
10/01/2025 ( Expired 162 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Macadamization of road from manohar galla to kassi swari by way of providing and laying wbm grade 2nd 75mm thick in one layer, wbm grade 3rd, 20mm thick premix carpet over 50mm thick bm in km 1st rd 0 to km 2nd rd 200 length 1.2 km
Macadamization of road from manohar galla to kassi swari by way of providing and laying wbm grade 2nd 75mm thick in one layer, wbm grade 3rd, 20mm thick premix carpet over 50mm thick bm in km 1st rd 0 to km 2nd rd 200 length 1.2 km
Read moreDevelopment of road length approx. 2.30 km from innao tiniali to well no. kmc 01 via kumchai eps by providing and laying 80 mm thick interlocking concrete paver block grade m30 with preparation of base course by 100 mm gsb and 150 mm wbm including supply of all materials except cement.
Development of road length approx. 2.30 km from innao tiniali to well no. kmc 01 via kumchai eps by providing and laying 80 mm thick interlocking concrete paver block grade m30 with preparation of base course by 100 mm gsb and 150 mm wbm including supply of all materials except cement.
Read moreRepair and renovation of existing road from murda hatt to hawa ghar to sidrabong hydel project total (1.70,4.70) 6.40 km length 1st 1.70 km by laying 25 mm thick mastic asphalt and balance portion 6 thick cement concrete over existing boulder soling
Repair and renovation of existing road from murda hatt to hawa ghar to sidrabong hydel project total (1.70,4.70) 6.40 km length 1st 1.70 km by laying 25 mm thick mastic asphalt and balance portion 6 thick cement concrete over existing boulder soling
Read moreLaying of mastic asphalt over bituminous surface to upgrade the existing road surface from hill cart road (dali fatak) towards sidrapong power house for a length of 2.10km along with other associated works under mini micro hydel division, kurseong.
Laying of mastic asphalt over bituminous surface to upgrade the existing road surface from hill cart road (dali fatak) towards sidrapong power house for a length of 2.10km along with other associated works under mini micro hydel division, kurseong.
Read moreof your Industry type