Tender Details
Particulars | Details |
---|---|
Title |
Laying Of Mastic Asphalt Over Bituminous Surface To Upgrade The Existing Road Surface From Hill Cart Road (Dali Fatak) Towards Sidrapong Power House For A Length Of 2.10 Km Along With Other Associated Works Under Mini Micro Hydel Division, Kurseong.
|
Description |
Laying Of Mastic Asphalt Over Bituminous Surface To Upgrade The Existing Road Surface From Hill Cart Road (Dali Fatak) Towards Sidrapong Power House For A Length Of 2.10 Km Along With Other Associated Works Under Mini Micro Hydel Division, Kurseong.
|
Organisation | WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD | State Govt. and UT |
Tender Id | 2024_WBSED_779257_1 |
Reference Number |
WBSEDCLCECET242503051224 |
Tender Fee | 0 |
EMD | 2.11 Lakh |
Tender Value | |
Place | SIDRAPONG H.E.PROJECT, DARJEELING |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1726246 |
Start Date | December 13, 2024 17:30 |
End Date |
06/01/2025 ( Expired 105 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair and maintenance for prion of leakage of barbotya flume channel along with other associated works at sidrapong hydel project under mini micro hydel division, kurseong, dist, darjeeling
Repair and maintenance for prion of leakage of barbotya flume channel along with other associated works at sidrapong hydel project under mini micro hydel division, kurseong, dist, darjeeling
Read moreSpecial repairing work of laying 25mm thick mastic asphalt on existing surface on permanent helipad along with repairing of approach and connecting road at digha permanent helipad ground under pwd, contai sub division in the district of purba medinip
Special repairing work of laying 25mm thick mastic asphalt on existing surface on permanent helipad along with repairing of approach and connecting road at digha permanent helipad ground under pwd, contai sub division in the district of purba medinip
Read moreRepair and renovation of existing road from murda hatt to hawa ghar to sidrabong hydel project total (1.70,4.70) 6.40 km length 1st 1.70 km by laying 25 mm thick mastic asphalt and balance portion 6 thick cement concrete over existing boulder soling
Repair and renovation of existing road from murda hatt to hawa ghar to sidrabong hydel project total (1.70,4.70) 6.40 km length 1st 1.70 km by laying 25 mm thick mastic asphalt and balance portion 6 thick cement concrete over existing boulder soling
Read moreLaying of mastic asphalt over bituminous surface to upgrade the existing road surface from hill cart road (dali fatak) towards sidrapong power house for a length of 2.10km along with other associated works under mini micro hydel division, kurseong.
Laying of mastic asphalt over bituminous surface to upgrade the existing road surface from hill cart road (dali fatak) towards sidrapong power house for a length of 2.10km along with other associated works under mini micro hydel division, kurseong.
Read moreof your Industry type