Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening And Strengthening Of Kamalapur Masterbag Bhandia Road (O.D.R) Ch. 0.000 To 6.800 Km (Length 6.8000 Km) In District Sitapur.
|
| Description |
Widening And Strengthening Of Kamalapur Masterbag Bhandia Road (O.D.R) Ch. 0.000 To 6.800 Km (Length 6.8000 Km) In District Sitapur.
|
| Organisation | Chief Engineer PWD Central Zone,Lucknow | State Govt. and UT |
| Tender Id | 2025_CEUCZ_1098444_1 |
|
Reference Number |
6287/352C/E.TEND/STP-LMP/25-26 Dt.20-11-2025 |
| Tender Fee | 2715 |
| EMD | 27 Lakh |
| Tender Value | - |
| Place | Sitapur |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2023226 |
| Start Date | December 15, 2025 17:30 |
| End Date |
Expired
26/12/2025
Expired 238 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening and strengthening, reconstruction work of rani road, rob barmasiya to kusumatand (mukunda) more via jhariya vihar colony belgariya road (length-7.612 km) in dhanbad district on deposit basis
Widening and strengthening, reconstruction work of rani road, rob barmasiya to kusumatand (mukunda) more via jhariya vihar colony belgariya road (length-7.612 km) in dhanbad district on deposit basis
Read moreConstruction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read moreConstruction of rob at ch-26th km of sobhan chowk (nh-27) to agropatti chowk makia (sh-52) road project (announced during pragati yatra) under district of darbhanga, bihar on epc mode
Construction of rob at ch-26th km of sobhan chowk (nh-27) to agropatti chowk makia (sh-52) road project (announced during pragati yatra) under district of darbhanga, bihar on epc mode
Read moreGeneral-rm - 2026-27 -rc1- one year running contract for various pwd roads under roads section koduvally ( given to maintenance wing)in kozhikode district 3 road stretches for a length of 8.80 km-running contract (rc1)-general civil work
General-rm - 2026-27 -rc1- one year running contract for various pwd roads under roads section koduvally ( given to maintenance wing)in kozhikode district 3 road stretches for a length of 8.80 km-running contract (rc1)-general civil work
Read moreDemolition of old superstructure & construction of new superstructure including overall maintenance + retrofitting work of high level rcc bridge (4x21.75m) in gaya koilwan road via pirthu, vishambharpur, gothani road at chainage-0.89 km in aurangabad district .
Demolition of old superstructure & construction of new superstructure including overall maintenance + retrofitting work of high level rcc bridge (4x21.75m) in gaya koilwan road via pirthu, vishambharpur, gothani road at chainage-0.89 km in aurangabad district .
Read moreEngagement of user fee collection agency through regular basis (e-tender) for kovilvenni fee plaza at km 59.000 of nagapattinam to thanjavur section from km 1.600 to km 16.690 and fromkm 29.850 to km 80.133 of nh-83 in the state of tamil nadu
Engagement of user fee collection agency through regular basis (e-tender) for kovilvenni fee plaza at km 59.000 of nagapattinam to thanjavur section from km 1.600 to km 16.690 and fromkm 29.850 to km 80.133 of nh-83 in the state of tamil nadu
Read moreRestoration of rain damages on jgi road km 0/00 to 4/00
Restoration of rain damages on jgi road km 0/00 to 4/00
Read moreRestoration of rain damages on jgi road km 0/00 to 4/00
Restoration of rain damages on jgi road km 0/00 to 4/00
Read moreRemoval of weeds and regrading the bed portion and cleaning of flood inlets and outlets at downstream of laxmipuram anicut from ls 114.80km to 116.30 inside the araniyar river in ponneri taluk of thiruvallur district
Removal of weeds and regrading the bed portion and cleaning of flood inlets and outlets at downstream of laxmipuram anicut from ls 114.80km to 116.30 inside the araniyar river in ponneri taluk of thiruvallur district
Read moreSelection and empanelment of transportation-cum-handling contractors for main transportation of food grains in muzaffarpur district
Selection and empanelment of transportation-cum-handling contractors for main transportation of food grains in muzaffarpur district
Read moreof your Industry type