Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rfp For Widening To 4 Lane From Km. 139.00 To Km 179.20 Of Nh 135 A Pkg Iii (Jaunpur Akbarpur Section) And Akbarpur Bypass In The State Of Uttar Pradesh On Ham Mode.
|
| Description |
Rfp For Widening To 4 Lane From Km. 139.00 To Km 179.20 Of Nh 135 A Pkg Iii (Jaunpur Akbarpur Section) And Akbarpur Bypass In The State Of Uttar Pradesh On Ham Mode.
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_773606_1 |
|
Reference Number |
CE-RO/LKO/NH-135A/Pkg-III/ 2022-23 Dt.27.09.2023 |
| Tender Fee | 80000 |
| EMD | 7.91 Crore |
| Tender Value | - |
| Place | Chief Engineer - Regional Office,MoRTH Lucknow |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | September 27, 2023 14:30 |
| End Date |
Expired
17/01/2024
Expired 1002 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of 6l gf ac indore eastern bypass starting from dc km 64.000 near pirkaradiya village and ending at dc km 113.000 on nh 347bg near village simrol/datoda pkg 1 of indore and dewas district in madhya pradesh on ham mode. l 49.00 km
Construction of 6l gf ac indore eastern bypass starting from dc km 64.000 near pirkaradiya village and ending at dc km 113.000 on nh 347bg near village simrol/datoda pkg 1 of indore and dewas district in madhya pradesh on ham mode. l 49.00 km
Read moreConst of 4/6l gf ludhiana rupnagar nh 205k from jn with ne to manewal (ludhiana) to jn with nh205 near bheora (rupnagar) with ludhiana bypass under nh(o) in punjab on ham pkg 2 dc 37.700 to 66.440 and ludhiana bypass dc. 0.000 to 18.500 tl 47.240 km
Const of 4/6l gf ludhiana rupnagar nh 205k from jn with ne to manewal (ludhiana) to jn with nh205 near bheora (rupnagar) with ludhiana bypass under nh(o) in punjab on ham pkg 2 dc 37.700 to 66.440 and ludhiana bypass dc. 0.000 to 18.500 tl 47.240 km
Read moreRehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-2) from design km 1423.000 sultanpura village to design km 1469.000 near ingui khurd village nh-27 in up on ham mode. (tl46.000 kms).
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-2) from design km 1423.000 sultanpura village to design km 1469.000 near ingui khurd village nh-27 in up on ham mode. (tl46.000 kms).
Read moreRehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.
Read moreRehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi-orai sec. (pkg-1) from design km 1378.915 near jhansi (sijwaha tiraha nh27) to design 1423.000 near sultanpura village nh-27 in up on ham mode. (tl44.085 kms)
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi-orai sec. (pkg-1) from design km 1378.915 near jhansi (sijwaha tiraha nh27) to design 1423.000 near sultanpura village nh-27 in up on ham mode. (tl44.085 kms)
Read moreCs as ie during o and m for 6 laning of i chitradurga davanagere including chitradurga bypass and ii davanagere to haveri section of nh 48 old nh4 in the state of karnataka under dbfot under nhdp phase v on ham mode
Cs as ie during o and m for 6 laning of i chitradurga davanagere including chitradurga bypass and ii davanagere to haveri section of nh 48 old nh4 in the state of karnataka under dbfot under nhdp phase v on ham mode
Read moreIe services for const of 6l gf ac indore eastern bypass starting from design km 64.000 near pirkaradiya vill and ending at design km 113.000 on nh 347bg near vill simrol datoda pkg1 of indore n dewas district in mp on ham mode l 49.00 km
Ie services for const of 6l gf ac indore eastern bypass starting from design km 64.000 near pirkaradiya vill and ending at design km 113.000 on nh 347bg near vill simrol datoda pkg1 of indore n dewas district in mp on ham mode l 49.00 km
Read moreConstruction of 4lane gf amritsar-katra connectivity of amritsar with dak expressway from mdr junction at ch.40.900 dhunda village-junction nh3 and taran taran bypass near mannawalla village ch.70.950 (km 40.900-km 70.950 pkg-2) on epc mode in punjab
Construction of 4lane gf amritsar-katra connectivity of amritsar with dak expressway from mdr junction at ch.40.900 dhunda village-junction nh3 and taran taran bypass near mannawalla village ch.70.950 (km 40.900-km 70.950 pkg-2) on epc mode in punjab
Read moreRfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.
Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.
Read moreof your Industry type