Tender Details
Particulars | Details |
---|---|
Title |
Work Of Installing Double Pole Meter In The Area Of Eudd Ii/Iii, Muzaffarnagar
|
Description |
Work Of Installing Double Pole Meter On The Premises Of Consumers Having Load Of 10 Kw To 25 Kw In The Area Of Eudd Ii/Iii, Muzaffarnagar
|
Organisation | Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT |
Tender Id | 2024_PVVNL_946778_1 |
Reference Number |
SHORT TERM E-TENDER NO. 27/2024-25 OF EUDC MZN |
Tender Fee | 1180 |
EMD | 2000 |
Tender Value | |
Place | IN THE AREA OF EUDD-II/III, MUZAFFARNAGAR |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1641749 |
Start Date | August 17, 2024 00:15 |
End Date |
22/08/2024 ( Expired 294 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLandslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project
Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project, baramulla district of ut of j and k, india
Read morePackage iii civil works of water conductor system and power house complex of tato ii hydro electric project
Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep
Read moreConstr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Read moreModification/shifting work of 400/220/132 kv lines, restoration of supply in case of collapsed/damaged tower, replacement of tower, stub repairing, resgaging of conductor, replacement of disc insulator etc. in central zone in mp on rate contract
Modification/shifting work of 400/220/132 kv lines, restoration of supply in case of collapsed/damaged tower, replacement of tower, stub repairing, resgaging of conductor, replacement of disc insulator etc. in central zone in mp on rate contract
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreProvision of gas godown and connected infrastructure for vayu sena gas agency and provn of iron grill cover water tanks ph i in domestic area at afs tezpur
Provision of gas godown and connected infrastructure for vayu sena gas agency and provn of iron grill cover water tanks ph i in domestic area at afs tezpur 
 
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreof your Industry type