Tender Details
Particulars | Details |
---|---|
Title |
Improvement Of Road From Ichamua To Yatra Bari And Nh08 To Kalibari Madhya Kashipur Length 2.00 Km Sh Metalling, Bm And Bc Under Amc Word No 25
|
Description |
Improvement Of Road From Ichamua To Yatra Bari And Nh08 To Kalibari Madhya Kashipur Length 2.00 Km Sh Metalling, Bm And Bc Under Amc Word No 25
|
Organisation | Government of Tripura |
Tender Id | 2023_CEPWD_41125_1 |
Reference Number |
50/SE-II/PWD(RandB)/2023-24 |
Tender Fee | 4000 |
EMD | 1.94 Lakh |
Tender Value | |
Place | Executive Engineer, Agartala Division No.I |
Link | https://tripuratenders.gov.in |
Start Date | August 23, 2023 15:25 |
End Date |
11/09/2023 ( Expired 621 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreWidening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Read moreUpgradation of rural road from bakultala junction to shyamkund at rangat north and middle andaman under pmgsy-iii batch-i, 2024-25.
Upgradation of rural road from bakultala junction to shyamkund at rangat north and middle andaman under pmgsy-iii batch-i, 2024-25.
Read morePeriodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Periodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Read moreOne time improvement of shillong-jowai road including construction of pucca side drain with footpath from km 54.200 to 69.200 km length 15.00 km in the state of meghalaya . job no. 44-mg-2024-25-178
One time improvement of shillong-jowai road including construction of pucca side drain with footpath from km 54.200 to 69.200 km length 15.00 km in the state of meghalaya . job no. 44-mg-2024-25-178
Read moreWbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreof your Industry type