Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing And Fixing Of New Expansion Tank In Place Of Old Expansion Tank On Chiller Line Of Ac Plant At Block A And Civil Works For Foundation Of Tank And Other Required Allied Work At Various Site In Gmch Sector 32, Chandigarh
|
Description |
Providing And Fixing Of New Expansion Tank In Place Of Old Expansion Tank On Chiller Line Of Ac Plant At Block A And Civil Works For Foundation Of Tank And Other Required Allied Work At Various Site In Gmch Sector 32, Chandigarh
|
Organisation | Chandigarh Administration | State Govt. and UT |
Tender Id | 2025_CHD_85826_1 |
Reference Number |
PH1/2025/198 |
Tender Fee | 0 |
EMD | 17350 |
Tender Value | |
Place | Chandigarh |
Link | https://etenders.chd.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=105711 |
Start Date | May 13, 2025 21:30 |
End Date |
20/05/2025 ( Expired 40 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreSupply and erection of tubular pole with allied works and supply, fitting and fixing led street light at various place under bansberia municipality
Supply and erection of tubular pole with allied works and supply, fitting and fixing led street light at various place under bansberia municipality
Read moreFixing of new turbo ventilators in place of damaged turbo ventilators and provision of translucent sheets on roof for utilization of day light in shop floors inside rfi.
Fixing of new turbo ventilators in place of damaged turbo ventilators and provision of translucent sheets on roof for utilization of day light in shop floors inside rfi.
Read moreConstruction of new shed for culinary, automated beverage and pet bottling unit in plant of pagrexco from foundation work to steel structure civil work including partition providing joinery and public health services etc distt hoshiarpur hsp_2025_030
Construction of new shed for culinary, automated beverage and pet bottling unit in plant of pagrexco from foundation work to steel structure civil work including partition providing joinery and public health services etc distt hoshiarpur hsp_2025_030
Read moreMaintenance work on up/haryana border -yamunanagar- saha-panchkula section of (old nh-73) (new nh-344) from km. 71.400 to km. 176.400 (package-1,2, 3) in the state of haryana and allied works on zirakpur-parwanoo section of nh-05.
Maintenance work on up/haryana border -yamunanagar- saha-panchkula section of (old nh-73) (new nh-344) from km. 71.400 to km. 176.400 (package-1,2, 3) in the state of haryana and allied works on zirakpur-parwanoo section of nh-05.
Read moreSpl repair to conversion of old rusted ci pipeline to di pipeline at chotapani to oh tank b and distribution line and allied works at umroi mil stn under ge umroi
Spl repair to conversion of old rusted ci pipeline to di pipeline at chotapani to oh tank b and distribution line and allied works at umroi mil stn under ge umroi
Read moreInternal improvement works of section no. s-408 (package-5) for water supply scheme 1. khuban and modi khera, block abohar, distt. fazilka (under nabard xxvii/jjm)
Repair of old ohsr (250 cum), repair of pump chamber 6.10m x 4.88m, distribution system, providing and fixing household connection and site laying at head works (boundary wall, footpath etc.) complete in all respect and all other works contgent the
Read moreDesilting of septic tank, replacement of pvc sewer line and providing cc patches for road cutting area at and construction of compound wall , supplying of play equipments at ward no. 23 old astc hudco in hosur city municipal corporation
Desilting of septic tank, replacement of pvc sewer line and providing cc patches for road cutting area at and construction of compound wall , supplying of play equipments at ward no. 23 old astc hudco in hosur city municipal corporation
Read moreof your Industry type