Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Expansion Of Seminar Room For Department Of Surgery Level Iii, Block D, Gmch 32, Chandigarh. (E.I. Work)
|
| Description |
As Per Nit
|
| Organisation | Chandigarh Administration | State Govt. and UT |
| Tender Id | 2024_CHD_84039_1 |
|
Reference Number |
E2/24/146 |
| Tender Fee | 0 |
| EMD | 5580 |
| Tender Value | - |
| Place | Chandigarh |
| Link |
View Original Tender Notice
https://etenders.chd.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=103346 |
| Start Date | December 24, 2024 18:00 |
| End Date |
Expired
31/12/2024
Expired 651 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws)
Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality) iv.) ward level piped water supply schemes in non quality affected wards (wls_non quality) , i.e. the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in blocks:- 08 total no. of schemes: 280 wls(non quality): 226 wls(quality): 05 pws (non quality): 35 svs (non quality): 14
Read moreGr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Gr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreRenovation of gynae o.t. level-1, block-a gmch sector-32, chandigarh. (e.i. work)
As per nit
Read moreRenovation of medicine and surgery emergency area 20 and 21, block a, gmch, sector-32, chandigarh (e.i. work).
As per nit
Read moreSetup of ayushman bharat cell in block-d level-iii, gmch, sector 32, chandigarh.
Setup of ayushman bharat cell in block-d level-iii, gmch, sector 32, chandigarh.
Read morePitc and handing over of fcu/ cs ahu and other allied works for room no.d-368, d-369 and seminar room of surgery department of level-iii, block d, gmch, sector - 32 chandigarh.
Pitc and handing over of fcu/ cs ahu and other allied works for room no.d-368, d-369 and seminar room of surgery department of level-iii, block d, gmch, sector - 32 chandigarh.
Read moreRenovation of gynae o.t. level-1, block-a gmch, sector-32, chandigarh. (e.i. work) (providing fire detectors).
As per nit
Read moreRenovation of room no.101 and seminar room in the department of radio diagnosis level-i, block-d, gmch-32, chandigarh.
Renovation of room no.101 and seminar room in the department of radio diagnosis level-i, block-d, gmch-32, chandigarh.
Read moreof your Industry type