Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply, Installation Of Monitoring Application Integrated With 4000 Liters Suction Machine Along With Annual Maintenance For 5 Years In Cherthala Municipality
|
| Description |
Supply, Installation Of Monitoring Application Integrated 4000 Litres Suction Machine Along With Annual Maintenance Of Machine For 5 Years In Cherthala Municipality
|
| Organisation | Directorate of Urban Affairs | State Govt. and UT |
| Tender Id | 2025_UAD_748886_1 |
|
Reference Number |
PH4/240299/25 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | Cherthala Municipality |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1211408 |
| Start Date | March 11, 2025 21:00 |
| End Date |
Expired
18/03/2025
Expired 444 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tender for supply, installation, commissioning of one mobile water quality monitoring van with 5 years of operation and maintenance
Tender for supply, installation, commissioning of one mobile water quality monitoring van with 5 years of operation and maintenance
Read moreFacial recognition based attendance monitoring cum security check system and material acceptance and billing management system along with installation and commissioning with comprehensive annual maintenance contract for a period of 4 years
Facial recognition based attendance monitoring cum security check system and material acceptance and billing management system along with installation and commissioning with comprehensive annual maintenance contract for a period of 4 years
Read moreHiring of jetting cum suction machine 4000 l capacity for maintenance of sewerage system in babar pur ac-67 under se(m)-2
Hiring of jetting cum suction machine 4000 l capacity for maintenance of sewerage system in babar pur ac-67 under se(m)-2
Read moreHiring of 1 no.jetting cum suction machine 4000 l capacity for maintenance of sewerage system in ward no-226 gautampuri in ac-65 seelampur under ee(c )-06
Hiring of 1 no.jetting cum suction machine 4000 l capacity for maintenance of sewerage system in ward no-226 gautampuri in ac-65 seelampur under ee(c )-06
Read moreDesign manufacture supply installation testing and commissioning of heavyduty machine room less and gearless lifts and heavy duty escalators along with two years dlp followed by three years of camc for indore metro rail project
Design manufacture supply installation testing and commissioning of heavyduty machine room less and gearless lifts and heavy duty escalators along with two years dlp followed by three years of camc for indore metro rail project
Read moreSupply, installation, testing and commissioning of different wattage led street lights within the limits of srinagar municipal corporation along with dlp/amc of 05 years.
Supply, installation, testing and commissioning of different wattage led street lights within the limits of srinagar municipal corporation along with dlp/amc of 05 years.
Read moreSupply, installation and commissioning of portable type mechanized transfer station with operation and maintenance for the period of 03 years at municipal corporation bhilwara
Supply, installation and commissioning of portable type mechanized transfer station with operation and maintenance for the period of 03 years at municipal corporation bhilwara
Read moreSupply and commissioning of manual and robotic system capable of inspecting water supply pipelines with diameters ranging from 80 mm to 2200 mm along with the operation and maintenance support for 3 years with all setup including vehicle and staff
Supply and commissioning of manual and robotic system capable of inspecting water supply pipelines with diameters ranging from 80 mm to 2200 mm along with the operation and maintenance support for 3 years with all setup including vehicle and staff
Read moreDevelopment of internal infrastructure for integrated manufacturing and logistics cluster at budaun with defect liability period and operation and maintenance for concurrent period of five years on epc mode
Development of internal infrastructure for integrated manufacturing and logistics cluster at budaun with defect liability period and operation and maintenance for concurrent period of five years on epc mode
Read moreAnnual rate contract for supply and installation of motor pump sets in existing sources in division deeg
Annual rate contract for supply and installation of motor pump sets in existing sources in division deeg
Read moreof your Industry type